100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Emergency works expected to help counter erosion ahead of storm season

Do you have a news tip? Click here to send to our news team.

Unit block proposal for historic beach shack site

A multimillion-dollar beachside property could be transformed into a six-storey apartment development under plans now before Sunshine Coast Council. The development application relates to a More

New public housing plans open for feedback

Consultation has opened on a proposal to build a public housing development on the Sunshine Coast. The proposed development is located at 230 Main Road, More

Petition raises concerns over crab pots and sharks

A petition calling for more dredging and restrictions on baited crab pots over concerns about waterway safety has reached Sunshine Coast Council. Created by Michael More

Young chef wins state title to earn place in national final

A 22-year-old Sunshine Coast chef has claimed the Queensland crown in a prestigious culinary competition. Ashton Teed was adjudged the state winner of the Nestle More

Researchers hunt causes behind younger cancer surge

A first-of-its-kind human tissue biobank will be established on the Sunshine Coast to combat Australia’s second-leading cause of cancer deaths. Researchers at the University of More

Women’s race record falls as runners flock to festival

The women's marathon race record was broken amid the biggest turnout in Sunshine Coast Marathon Festival history. Noosa-based American Beth McKenzie hit the line in More

Dredging work is about to start as part of a $20 million emergency package to address erosion and tidal breakthrough impacts at an island off the Sunshine Coast.

The dredger will start operating in the Pumicestone Passage on Sunday, to help restore sections of Bribie Island and help protect coastal communities ahead of storm season.

A site compound was established in recent weeks and crews have now started welding together 100m-long pipe strings and floating them out to the dredger via the Golden Beach foreshore, north of the Caloundra Power Boat Club.

Breakthroughs two and three are scheduled to be closed, and nourishment of the island between breakthrough one and three started, by the end of November, with all dredging and associated construction works scheduled to be completed by the end of April.  

On-water dredging activities will occur up to 24 hours a day with most on-land construction activity occurring between 6am and 6pm, daily. Excavators and bulldozers appear to have started preliminary works on parts of the island this week.

Want more free local news? Follow Sunshine Coast News on Facebook, LinkedIn and Instagram, and sign up for our FREE daily news email.

Work is about to start in earnest in the Pumicestone Passage.

Deputy Premier  Jarrod Bleijie said the works were critical in safeguarding the local community following years of erosion.

“The Crisafulli Government is taking action ahead of the upcoming storm season,” he said.

“Without intervention, remaining sections of the island may be lost entirely, creating significant safety and infrastructure risks to the Caloundra community and users of Pumicestone Passage.

“This emergency package is delivering real action now, while laying the foundations for the long-term restoration and protection of this iconic part of Queensland’s coastline.

Some of the pipes to assist with works.

“The Crisafulli Government is committed to restoring and protecting Bribie Island and the Pumicestone Passage for generations to come and these emergency works are an important milestone for the Bribie Island community and the broader Sunshine Coast.

“We know how important Bribie Island and the Pumicestone Passage are – not just for locals, but for tourism, the environment and the safety of nearby communities as we head into storm season.”

Member for Caloundra Kendall Morton said the emergency package delivered immediate action to protect the coastline communities.

“Residents of Golden Beach and surrounds have seen firsthand the impact of erosion and changing tidal flows,” she said.

The second breakthrough at Bribie Island. Picture: Damien Lange, droner.au

Member for Pumicestone Ariana Doolan said the investment would help preserve the area for generations to come.

“Protecting our passage means protecting our community’s lifestyle, our economy and our future, and I’m proud to be part of a government that delivers investment to safeguard what matters most to all of us,” she said.

Coordinator-General Gerard Coggan said fast-tracking dredging was a priority to safeguard the unique environment and the local community.

“These emergency works are critical to mitigating further damage to the internationally recognised Ramsar wetland, as well as protecting property, community infrastructure, and public safety with the storm season approaching,” he said.

“We recognise the temporary disruptions these works may cause, including changes to access and increased activity in the area. We appreciate the community’s patience and cooperation as we work to protect and restore this unique part of Queensland’s coastline for future generations.”

The state government-led action comes after three tidal breakthroughs occurred at the northern end of the island – the first in early 2022 and the second and third this year (see Damien Lange’s video below).

The events have contributed to changed tidesshifting sands, the closure of the Caloundra Bar and erosion on the mainland.

Authorities are also considering a bold recommendation to fill the initial breakthrough, which is about 1.5km wide, and reopen the Caloundra Bar.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share