100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Milestone for project set to transform Sunshine Coast public transport

Do you have a news tip? Click here to send to our news team.

Appeal for information after urn with ashes washes ashore

Authorities are looking for the owner of an urn that was found on a Sunshine Coast beach. Sunshine Coast police issued a ‘lost property appeal’ More

Fire brigade set for upgrade

A rural fire brigade could move into a new purpose-built station immediately beside its existing home under plans for a significant upgrade to its More

Finalists named for biosphere awards

Local champions of the environment including individuals, social groups, businesses and schools have been named as finalists in an annual awards program. The 2026 Noosa More

Man charged after alleged theft

A man has been charged with three offences after police allegedly apprehended him following a foot pursuit on the Sunshine Coast. Police allege a backpack More

Sports and events precinct in firing line of The Wave

A well-used sports and events venue is projected to make way for a mass public transport project. The Kawana Sports Western Precinct at Birtinya is More

Church applies to broaden venue use

A 400-person church facility could be opened to a much wider range of events under a new proposal. Hm.church Ltd has lodged a development application More

Design and pre-construction contracts have been awarded for a multibillion-dollar rail line on the Sunshine Coast.

Contracts have been announced for Stage 1 of The Wave, a planned rail and metro vehicle route between Beerwah and Sunshine Coast Airport.

Stage 1 will include 19km of dual track rail line between Beerwah and Caloundra, new train stations at Aura (Bells Creek) and Caloundra, and upgrades to Beerwah station.

Beerwah Coast Connect, a consortium of Georgiou, Hatch and Laing O’Rourke, has been awarded the contract for design and pre-construction works across existing sites in Beerwah and surrounding areas (brownfield works).

CoastalTraX, a consortium of Acciona and Georgiou, will deliver design and pre-construction works across undeveloped land (greenfield works), connecting with the brownfield package east of Steve Irwin Way through to Caloundra.

Alstom and UGL have been awarded the contract to deliver the European Train Control System (ETCS) signalling solution.

A map of The Wave.
The Wave, including Stage 1, between Beerwah and Caloundra.

The state government will work with Beerwah Coast Connect and CoastalTraX to refine detailed designs during the next 12 months. This will include ongoing site investigations and further community consultation on station precincts later this year.

Stage 1 has $5.5 billion in joint funding from the federal and state governments.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

Federal Minister for Infrastructure, Transport, Regional Development and Local Government Catherine King said the rail line was infrastructure the region needed.

“This project will create jobs, boost economic growth and improve connectivity for Sunshine Coast communities and businesses,” she said.

Queensland Deputy Premier and Minister for State Development, Infrastructure and Planning and Member for Kawana Jarrod Bleijie said The Wave would transform the Sunshine Coast’s transport network.

“This milestone demonstrates our commitment to delivering the infrastructure Queensland needs,” he said.

“Stage 1 is just the beginning. The Wave will connect people to jobs, education and essential services, now and into the future.”

Transport Minister Brent Mickelberg, Caloundra MP Kendall Hatcher and Deputy Premier Jarrod Bleijie.

State Member for Caloundra Kendall Hatcher said the region required key infrastructure.

“The southern end of the Sunshine Coast is one of the fastest growing regions in the state,” she said.

Future stages of The Wave include a rail line between Caloundra and Birtinya and a metro vehicle network between Birtinya and Sunshine Coast Airport, but it’s not clear how they will be paid for.

The state government aims to complete The Wave by the 2032 Olympic Games.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share