100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Aroona to Beerwah in 15 minutes: more details on planned station revealed

Do you have a news tip? Click here to send to our news team.

Bridge rebuild earns honours

A bridge rebuilt after severe weather damage has won a major engineering award. Noosa Council’s Schreibers Road Bridge Rebuild, delivered in partnership with Northlane Consulting More

UniSC study finds tactic that could slow bushfires

A University of the Sunshine Coast study has identified a potential way to help combat bushfires and give communities more time to prepare or More

New housing development proposed for beach town

Plans have been lodged for a residential development aimed at older Sunshine Coast residents looking to downsize without leaving their local community. Halpin Property Group More

Approval clears path for coastal unit project

An apartment development has been given the green light in a beachside community, with construction expected to begin next year. Sunshine Coast Council has approved More

Your say: seawall fall, industrial zone and more

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name More

Bridge upgrade moves into ‘complex stage’

Crews are preparing to tackle "challenges" as a bridge renewal project shifts into a new phase. The $9.2m Doonella Bridge upgrade, which is set to More

Preliminary works are underway on a train station in Sunshine Coast suburbia.

Site investigations have started for the planned Aroona Station, beside the Parklands shopping centre and tavern in residential Caloundra.

The platforms would be just north of a proposed rail tunnel under Little Mountain.

Construction could start next year.

It’s part of multibillion-dollar project The Wave, which is set to include a new train line and stations between Beerwah and Birtinya, a metro vehicle network between Birtinya and Sunshine Coast Airport and an upgraded interchange at Mooloolah River.

Deputy Premier David Crisafulli was recently at the Aroona site, to laud the start of early works.

“There’s geotechnical work being done and that will form the basis of the design work to create a world-class station for a world-class Wave, to deal with the congestion problems that this city and this community have been living under,” he said.

A map showing where the Aroona Station is likely to be, north of a tunnel and south of an elevated line.

“We must deliver generational infrastructure, and The Wave is just that.”

A Transport and Main Roads spokesperson said The Wave would reduce travel time for commuters.

“The Wave, including the Mooloolah River Interchange Upgrade (MRIU), is part of the Queensland Government’s once-in-a-generation investment to build the roads and infrastructure the Sunshine Coast needs.”

“This transformative project will help shape the region’s future with a legacy of improved connectivity and will support a better lifestyle through a stronger economy.

The Wave will feature high-frequency trains travelling between Beerwah and Birtinya.

“New stations closer to home will give residents a genuine alternative to driving to the Sunshine Coast Airport, the Sunshine Coast University Hospital and Brisbane.

“The Wave will support faster trips between Birtinya and Brisbane, with residents saving up to 45 minutes when compared to driving in peak hours.”

The journey from Aroona Station to Beerwah Station could take just under 15 minutes, while a trip from the planned Caloundra Station, just to the south of Aroona, to Roma Street Station in Brisbane could take 1 hour and 23 minutes during the morning rush.

Help us deliver more news by registering for our FREE daily news feed. All it requires is your email at the bottom of this article.

How the Aroona Station could be designed.

Aroona Station is proposed to be elevated over Parklands Boulevard. It would accommodate six-car trains and be future-proofed for nine-car trains.

The detailed design phase will occur after the awarding of a contract to a delivery partner later this year.

The station would be accessible for all and include connections to bus bays, kiss ‘n’ ride and park ‘n’ ride facilities.

A concept design has been released and further consultation on key elements of the design will occur later this year.

Sunshine Coast Mayor Rosanna Natoli, Maroochydore MP Fiona Simpson, Deputy Premier Jarrod Bleijie, Premier David Crisafulli, Transport Minister Brent Mickelberg and Caloundra MP Kendall Morton at the site of the proposed Aroona Station.

The state government is intent on delivering The Wave by the Olympic Games in 2032.

Stage 1 of The Wave includes a train line and stations between Beerwah and Caloundra and has funding from the state and federal governments. Stage 2 includes a train line and stations from Caloundra to Birtinya and is on the Infrastructure Australia Priority List for possible federal government funding.

Stage 3 includes a metro vehicle network from Birtinya to Sunshine Coast Airport and the Mooloolah River Interchange Upgrade. It’s unclear how it will be paid for.

Major construction activities are expected to start in early 2027, subject to environmental approvals.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share