100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Proposed $50m centre to propel school's performing arts into the spotlight

Do you have a news tip? Click here to send to our news team.

Police appeal for help to find man missing for two weeks

Police are appealing for public assistance to locate a man last seen almost two weeks ago. Timothy Reynolds, 33, was reported missing from Rosemount on More

Your say: holiday park bookings, bank closure and more

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and More

Draft report on plan for 12,000 homes goes public

A developer’s plan to deliver up to 12,000 dwellings as part of a new masterplanned community has opened to public comment. Stockland has proposed to More

Popular headland path about to be revamped

One of the Sunshine Coast’s most well-known stretches of walkway is about to get a makeover. The 650m section of coastal path at Alexandra Headland, More

New community garden sprouts on Coast

The Sunshine Coast has a new community garden, providing residents of Meridan Plains a vibrant space to grow vegetables, herbs, flowers and fruit while More

Family mourning beloved cat after backyard dog attack

A Sunshine Coast family is mourning the loss of their beloved cat after it was attacked by two roaming dogs in its own backyard. Family More

An award-winning private school is poised to build a $50m performing arts centre.

St Andrew’s Anglican College at Peregian Springs has charged ahead with development in recent years, opening a $15m learning hub in 2015 and an impressive $14m aquatic centre in 2019.

The school, which caters for kindergarten to Year 12, is also constructing more car parks and multi-purpose courts, worth $8m, this year.

But plans for a leading performing centre have taken the spotlight.

The school’s principal, Reverend Chris Ivey, said the venue would be first-class.

“The facility, when completed, will be one of the finest school rehearsal and performing spaces,” he said.

“We have gone through an extensive consultation process with key stakeholders and a strong focus on students, acoustics and connecting with our environment are key parts of the project.”

There were initial considerations to design and build the venue in one go but, after “wrestling with the details”, it was decided the facility would be constructed in two stages and completed within a decade.

St Andrew’s Anglican College at Peregian Springs.

Stage one, worth $30m, is expected to include an administration precinct, undercover area, cafe and performing arts facilities, to be opened in 2025.

Stage two, worth $20m, is set to boast a showpiece 550-seat auditorium, opened by 2027 to 2032.

Reverend Ivey said the centre would be paid for by the college and it would include several learning areas.

“The current proposal consists of three purpose-built rehearsal spaces for differing ensembles, a black box (a simple performance space), teaching spaces, instrumental teaching spaces, break-out spaces and storage space for costumes, instruments and props.”

Reverend Ivey said the facility was needed to accommodate the school’s flourishing performing arts sector.

“The program has grown over many years and we simply don’t have the room to grow any further in terms of tuition, rehearsal and storage spaces,” he said.

He said music, dance and drama were highly valued at the school.

“Performing arts, like every other aspect of our co-curricular program, provides opportunities for our students to develop their personal capacity,” he said.

“Performing arts allows students to work with students outside their normal age group, allows them to commit to teamwork, develop skills and most importantly, provide a service to others through their performances.”

The aquatic centre at St Andrew’s.

The school also has plans to expand its science, technology, engineering, arts and mathematics departments, and its secondary school outdoor areas. It is also aiming for multi-purpose hall duplication, to be completed by 2027 to 2023.

There were no drawings/impressions, at this stage, for the performing arts centre, which is being designed by m3architecture.

Like stories about Sunshine Coast people doing great things? Help us deliver more by registering for our free daily news feed. All it requires is your name and email. See SUBSCRIBE at the top of this article.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share