100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Public transport corridor becomes clearer as work ramps up on interchange

Do you have a news tip? Click here to send to our news team.

Council rejects shark link to sand pumping

A community coastal advocacy group has raised concerns that sand pumping at Maroochydore Beach is attracting bull sharks closer to shore, a claim Sunshine More

Coast racing industry’s huge economic impact revealed

The Sunshine Coast racing industry’s impressive economic footprint has been detailed in an extensive report. The local sector injected more than $156 million into the More

Police investigate serious two-car collision

Police are appealing for information as they investigate a serious two-vehicle crash that occurred in the early hours of the morning. Initial investigations indicate that a More

Cat’s tick ordeal highlights risk

A Sunshine Coast cat’s battle with paralysis has emphasised the danger that ticks pose to pets, as new research shows where the tiny arachnids More

Pallister caps dream meet with second Ledecky defeat

Lani Pallister has toppled swimming legend Katie Ledecky for a second time in 24 hours to complete her stunning Pan Pacific championship campaign with More

Land rezoning plan targets future business growth

Community feedback is being sought about rezoning around 20ha of land in a hinterland town. A proposed amendment to the Noosa Plan 2020 would rezone More

Maps showing a planned public transport route have been revealed by the state government.

The details show where metro-style vehicles could run, including corridor alignment and station locations, for Stage 3 of The Wave. A contractor was also announced to deliver the next stage of early works for the extensive Mooloolah River Interchange.

The metro vehicles are expected to deliver a high-capacity, high-frequency service connecting key growth areas, major employment hubs and essential services across the region.

The maps reveal where they will travel between the Sunshine Coast University Hospital at Birtinya and a station near the Buderim Waste Landfill Centre at Mountain Creek, along with concept designs for a stretch between Mountain Creek and the Sunshine Coast Airport. Final route details for that section are expected in 2027.

The upgrades will integrate with a planned heavy passenger rail connection at Birtinya as part of The Wave, a planned multibillion-dollar project including a new rail line between Beerwah and Birtinya and the metro vehicle system between Birtinya and the airport, via the Maroochydore City Centre.

Meanwhile, a major contract was awarded to kick off the next phase of early works for the MRI, which is on the Stage 3 route.

An impression of a ‘metro-style vehicle’ and the planned station at Birtinya.

McIlwain Civil Engineering and SEE Civil Joint Venture will deliver the works, including major earthworks and embankment construction to prepare the site for the full interchange upgrade.

The early works package will see thousands of tonnes of material moved to build a strong foundation for the new interchange infrastructure.

The works will reshape the interchange in preparation for The Wave Stage 3, to support the future metro corridor and improve traffic flow through one of the Sunshine Coast’s busiest pinch points.

Help keep independent and fair Sunshine Coast news coming by subscribing to our FREE daily news feed. All it requires is your email at the bottom of this article.

The Wave, including rail between Beerwah and Birtinya and metro vehicle between Birtinya and Sunshine Coast Airport, and the Mooloolah River Interchange Upgrade.

Deputy Premier Jarrod Bleijie said the MRI upgrade and The Wave in general would be gamechangers for the Sunshine Coast.

“The Crisafulli Government is delivering the infrastructure needed to support one of Queensland’s fastest-growing regions, which is why we’re delivering The Wave all the way to the airport,” he said.

“These early works on The Wave are another way we are delivering the largest transport infrastructure investment ever planned for the Sunshine Coast.”

Early works have started on The Wave Stage 1 (rail between Beerwah and Caloundra), which has $5.5 billion in joint funding from the state and federal governments.

But Stage 2 (rail between Caloundra and Sunshine Coast Hospital University at Birtinya) and Stage 3 (metro vehicle between Birtinya and Sunshine Coast Airport at Marcoola) are yet to be funded. There was no room in the recent state budget for the projects and there was a lack of federal government commitment for them.

State Opposition Leader Steven Miles criticised the government for its handling of the transport projects.

“The Sunshine Coast is growing and it needs the growing infrastructure to keep pace,” he said.

“This is now the LNP’s second budget and we are no closer to seeing the rail built, or the roads delivered. Sunshine Coasters deserve better than spin after this bad budget.”

State Opposition Leader Steven Miles and Shadow Minister for Transport Bart Mellish on the Sunshine Coast on Monday.

Shadow Transport Minister Bart Mellish said the projects were behind schedule and more expensive.

“The LNP wants the Sunshine Coast to take them at their word on transport, but their promise to deliver projects on time and on budget has already blown out,” he said.

But the state government recently stated that it was committed to delivering the projects by 2032, and Mr Mickelberg on Monday said the initiatives would be critical to uplifting safety for thousands of motorists every day.

“Both the MRI and The Wave will reduce congestion, improve safety and support a high-frequency metro system that connects people to jobs, health care and education,” he said.

Minister for Transport and Main Roads Brent Mickelberg.
Minister for Transport and Main Roads Brent Mickelberg.

Member for Maroochydore Fiona Simpson said the upgrades would make a difference for locals who rely on it every day.

“The fix for one of the worst and most dangerous points on the Sunshine Motorway is finally being delivered by the Crisafulli Government and we continue to hit major milestones in our progress,” she said.

“This is one of the most important transport corridors on the Sunshine Coast and this project means safer, smoother and faster trips for everyone.”

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
Share