A long-awaited retail development in a hinterland town is back before the court as its developer seeks changes to a scheme approved more than two years ago.
Revised designs for Eumundi’s first full-line supermarket would increase retail floor area and alter parking, pedestrian access, landscaping and the appearance and layout of the approved shopping centre at 10 Memorial Drive.
Eumundi Holdings Pty Ltd has returned to the Planning and Environment Court, which granted the shopping centre approval in July 2024, seeking to have the revised scheme accepted as a minor change to that approval.
The new application was filed on November 19, with the court to consider the next steps on December 10.
Plans filed with the court show total gross floor area would increase from 1472sqm to 1596sqm, while site cover on the shopping centre portion of the property would rise from 31.7 per cent to 35.4 per cent.
The supermarket’s ground-floor tenancy would become slightly smaller, reducing from 1200sqm to 1154sqm, but a new 65sqm ancillary and services area would be added above it.

Specialty retail space would expand from a combined 272sqm to 377sqm. A tenancy adjoining the supermarket would increase from 100sqm to 127sqm, while the standalone specialty-retail building would increase from 172sqm to 250sqm.
The revised plans provide 77 car parks, one more than the approved scheme, including four electric vehicle charging spaces.
However, traffic engineer Stuart Holland calculated the planning scheme parking rate for the larger centre would require 80 spaces, leaving a three-space shortfall.
Mr Holland, who was retained by Eumundi Holdings as an expert witness, considered the shortfall acceptable because the adjoining approved service station would provide 14 spaces where eight were required.
The carpark would also be reconfigured, with changes to motorcycle and bicycle parking, relocation of the accessible parking space and pedestrian connection, and a wider north-south aisle.
Pedestrian infrastructure outside the main carpark would also change.
Part of the shared path towards Crescent Road, which the existing approval generally requires to be at least 2.5m wide, would narrow to 2m for about 13m near an existing culvert.
Mr Holland said the arrangement responded to physical constraints in the area and would operate safely and satisfactorily.
A separate footpath required along the western boundary of the property, south of the access driveway on Memorial Drive, would be deleted.
The proposal also includes changed line marking at the Eumundi Noosa Road roundabout to provide a single departure lane into Memorial Drive instead of two.
The buildings themselves would change substantially in shape and treatment.
The standalone specialty retail building would become longer and narrower, with its roof apex increasing, and changes to its shape, materials, glazing and shopfront presentation.

Urban designer and landscape architect Dr Nicholas McGowan, another expert retained by the applicant, said the revised supermarket would appear “slightly bulkier”.
He also identified reduced landscaping widths in some locations but said sufficient space would remain for multi-tiered planting and screening.
Dr McGowan concluded the proposed changes would not materially alter the character and appearance of the approved development or create new or greater visual impacts.
Town planner Christopher Buckley said the underlying use remained unchanged, with the development continuing to comprise a supermarket and specialty retail tenancies.
He said the increases in gross floor area and site cover had to be considered in the context of the development as a whole and concluded the changes did not represent “any substantial departure from the form of development which was approved by the court”.
Mr Buckley also relied on the traffic, engineering and visual evidence in concluding the proposal would not result in a substantially different development.
Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.
Those conclusions form part of the evidence lodged on behalf of Eumundi Holdings. Sunshine Coast Council is the respondent in the proceeding and the court has not yet determined the minor change application.
The development has a lengthy planning history.
Eumundi Holdings appealed to the Planning and Environment Court against the council’s deemed refusal of the supermarket application in 2023. The council subsequently supported approval, while two co-respondents initially opposed the proposal before withdrawing from the proceedings. The dispute had been heading towards a contested court hearing.
The shopping centre was ultimately approved by the court in July 2024 after Eumundi Holdings and the council reached agreement, ending a planning process that had stretched for about five years.
That decision cleared the way for Eumundi’s first full-line supermarket and specialty shops on the 9915sqm property at the southern end of town, alongside a separately approved service station.
Detailed plans for the service-station component were lodged with the council in June as that part of the broader development moved ahead.