100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Seawall revamp aims to respond to increased coastal hazard risk along foreshore

Do you have a news tip? Click here to send to our news team.

Property boom continues but affordability slows growth

Sunshine Coast real estate prices are continuing to climb, placing more pressure on first-home buyers and renters. Data from real estate experts PropTrack shows the More

Airport powers ahead with solar scheme

A key regional aviation hub has unveiled its first large-scale solar project, with 320 panels installed on the terminal roof. Sunshine Coast Airport's 190.24kW system More

B2B: Why trust minutes are so important for good governance

Preparing trust minutes is a critical part of good governance and compliance for trustees. Here’s why they are so important. Also known as a trust More

Photo of the day: dog at dawn

Win Fowles took this photo at Coondibah Creek, Currimundi. If you have a photo of the day offering, email photo@sunshinecoastnews.com.au. Photos must be horizontal/landscape and More

Tough calls and tighter belts in council budget shake-up

Sunshine Coast Council has launched a major financial overhaul in its annual budget, cutting costs while lifting rates to manage rising pressures. The $1 billion More

Pub out, wellness in: revised plan up for feedback

Residents are being invited to have their say on proposed changes to a development in a bustling Sunshine Coast suburb. Locals have until July 21 More

Work is set to start next month to reconstruct the seawall along a popular stretch of foreshore that has been affected by wild weather.

Construction on the seawall from Nelson Street to the TS Onslow Naval Cadets site at Golden Beach is expected to start in mid-June and be completed by early December 2025, weather permitting.

The foreshore was initially impacted by the extraordinary weather events of 2021 and 2022, with subsequent widening of the Bribie Island breakthrough increasing the coastal hazard risk to the site and other parts of Golden Beach.

“This project will protect the valuable park, Coastal Pathway and road near the seawall from coastal hazards,” Sunshine Coast Division 2 councillor Terry Landsberg said.

“It will also provide better access to the water, with overall beach and waterway access increasing to two new staircases and two four-metre-wide ramps.

Related story: Seawall set for $4.5m repair job in wake of breakthrough

“Work will include building a 208-metre-long rock seawall and concrete stepped wall, constructing two staircases and integrated beach access ramp with added landscaping.

“We’ll also reconstruct the damaged boat ramp at the Navy Cadets site, enhance the surrounding parklands (and) improve beach accessibility and the Coastal Pathway along the Esplanade.”

Most of the seawall will be a combination of placed rock and concrete walls, which can be adapted in the future by adding extra layers of rock or higher walls.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.auYou must include your name and suburb.

Cr Landsberg said a physical seawall model was built and tested at Manly Hydraulics Laboratory to optimise the design.

“The modelling and testing helped confirm the seawall is designed to be fit for purpose to protect against storms and waves in this location,” he said.

Material containing asbestos was found in the area in 2023, with a cleanup and remediation required.

“This project also aims to further prevent any asbestos from entering the passage, ensuring public safety is maintained,” Cr Landsberg said.

An artist impression of the reconstructed boat ramp at the TS Onslow Naval Cadets site in southern Golden Beach.

An exclusion zone will be established around the site during construction, with signed detours for pedestrian safety, but the Coastal Pathway, nearby businesses and the beach in front of access 319A will remain open. Some noise and temporary changes to parking are expected.

Work on the Nelson Street to TS Onslow Naval Cadets section follows the completion of seawall reconstruction works between the nearby Jellicoe and Nelson streets.

The project included reconstructing and raising about 80 metres of the existing seawall using grouted rock and installing special concrete tiles that aim to create a ‘living seawall’ with habitat for marine creatures.

Related stories: Moffat Beach seawall work set to begin after design finalised; Contractor appointed, design revised for foreshore works

In a press release, the council said it welcomed the state government’s announcement of an independent review of the Bribie Island breakthrough.

It pointed out that Bribie Island is part of a national park, and that Pumicestone Passage lies within the Moreton Bay Marine Park, both of which are managed by the state government. Council said it offers support to the government as needed.

The council is partnering with the Australian and Queensland governments on the latest Golden Beach seawall works, with joint funding coming under Disaster Recovery Funding Arrangements. The Department of Sport, Racing and Olympic and Paralympic Games is administering the funding.

Subscribe to SCN’s free daily news email

This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share