Tribunal finds against builder whose clients withdrew from contract

Do you have a news tip? Click here to send to our news team.

Three Coast men fined $5000 over illegal campfire

A Sunshine Coast trio has been fined more than $5000 after an illegal campfire they lit at Teewah in the Cooloola section of the More

Police appeal for help to find missing woman

An appeal for public assistance has been issued by police as they try to locate a 20-year-old woman reported missing from Sunrise Beach since More

Community urged to ‘Adopt a Family’ this Christmas

The community is being called on to help bring joy to struggling families this Christmas, as Sunshine Coast Publishing Company relaunches its annual Adopt More

Ashley Robinson: ‘I forecast storms brewing’

A requirement of the job is that you don’t have to be right all or even part of the time. Tick. Make up sentences More

B2B: Providing equipment to work from home

Many businesses continue to offer flexible work-from-home arrangements. To assist, employees are often provided with work-related items to assist them to work from home. In general, More

Photo of the day: inquisitive fellow

Lesley Evans captured this white-faced heron checking out the surf at Kings Beach one morning. If you have a photo of the day offering, email More

An award-winning builder who brought his clients before a tribunal after they pulled out of a contract has been ordered to pay them a sum of money.

Number One Quality Homes, directed by Gino Loiero, went to the Queensland Civil and Administrative Tribunal after Daniel and Judith Murphy withdrew from their contract with him.

QCAT was asked to decide if the Murphys had the legal right to withdraw from the contract.

The QCAT documents show the Murphys engaged Mr Loiero to build a granny flat and garage for them on a block at Buderim in 2017.

After preliminary works were completed on site, the Murphys visited Mr Loiero at his home when he produced a Master Builders Cost-Plus contract.

Under a cost-plus contract, the builder is reimbursed for costs and is paid an agreed sum on top of that as profit.

The Murphys made 11 payments totalling $651,444 before taking possession of the dwelling on June 10, 2018.

According to QCAT documents, the Murphys withdrew from the contract on October 3, 2018, after they had been invoiced for the final payment of $62,444 for the building work completed by Mr Loiero’s company.

Help us deliver more news by registering for our FREE daily news feed. All it requires is your email at the bottom of this artic

The exact reasons for the Murphys’ withdrawal from the contract were not explained in the QCAT decision but reference was made to the quality of the building work, delay and cost overruns, and whether their decision to withdraw was unconscionable.

They claimed they had a right to withdraw as they had never been supplied with a copy of the building contract or the consumer building guide.

Mr Loiero contended he had offered them their copy of the schedule of contract when it was signed on September 26, 2017, and they took it and stood up to leave.

He claimed he offered them the rest of the documents but Mr Murphy declined on the basis that he had built hundreds of homes.

The Murphys claimed they were not offered a copy of the general conditions or the consumer building guide.

Mrs Murphy said she had not realised what the documents offered by Mr Loiero did or did not include but recalled her husband asking for an entire completed copy of the cost-plus contract.

QCAT member Scott Mackenzie found there was no evidence that the consumer building guide had been part of the contract pack at the meeting where the contract was signed.

Mr Mackenzie also found it was unlikely that Mr Murphy, a director of 1170 Developments and Gateway Constructions SEQ, with experience building homes, shopping centres and childcare centres, would have refused some documents.

“It is most unlikely Mr Murphy, a person experienced in the building industry and building his own home, would accept some documents but refused to accept other documents,” he said.

“I accept Mr Murphy’s evidence the documents were not offered to him and Mrs Murphy by Mr Loiero at the meeting.”

Mr Mackenzie found it was likely they had never been offered a copy of the general conditions or consumer building guide and nor had they ever asked for them.

He found the Murphys effectively withdrew from the contract.

As Mr Loiero’s out of pocket expenses to that point had been $623,066 and they had paid $651,440, he ordered Mr Loiero to pay them $28,373.

Number One Quality Homes won the Sunshine Coast, Queensland and national Master Builders awards for individual home construction in the $401,000-$550,000 category in 2010 for another home at Buderim.

The national win was regarded as a remarkable achievement at the time as it was only Mr Loiero’s second attempt at entering the awards.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share