100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Clean-up efforts from 2022 floods continue with works on key road

Do you have a news tip? Click here to send to our news team.

First park opens in estate’s latest precinct

Australia’s largest master-planned community has opened its newest park. Hilltop Park in Aura’s new Acacia precinct features a play structure atop a two-metre-high mound with More

New tourism campaign promotes Coast ‘sickie’

“Don’t fake it, take it” is a local tourism body’s cheeky new slogan urging workers to take a "Sunshine Sickie". Visit Sunshine Coast's bold statement More

Jane Stephens: The stamina for setting goals

The most effective goals in life are big and juicy – and just a touch audacious. They are the kinds of targets that you have More

B2B: How to maximise your business value

Many owners run their business to fund their lifestyle and that of family members, but do not get time to focus on maximising business More

Photo of the day: whale tail

John Anderson photographed this whale off Mooloolaba. If you have a photo of the day offering, email photo@sunshinecoastnews.com.au. Photos must be horizontal/landscape and may need More

Brewery fights to stay open amid legal challenges

The operators of the popular Terella Brewing at North Arm have started a fundraising campaign to help with legal costs as they fight to More

Works have started on repairing two sections of a key inland road damaged by floods two years ago.

The Department of Transport and Main Roads is undertaking repairs along Obi Obi Road at Obi Obi.

A TMR spokesperson said works started in September and should be complete early next year, weather and construction conditions permitting.

“The project scope entails rock bolt installation, rock mattress and shotcrete installation as well as road pavement reconstruction and hydro-mulching,” they said.

“The works, located at two sites west of the Obi Obi Range, will ensure the continued stability of the slope and serve to prevent future landslips caused by heavy rainfall events.”

The works are funded by the Australian and Queensland governments through the Disaster Recovery Funding Arrangements.

The sites of the landslips.

Obi Obi Road is a critical link in the Sunshine Coast hinterland, connecting the Blackall Range with the Mary Valley.

Related story: Site of large landslip to be reconstructed soon

The repairs there are being undertaken as part of a broader program of work to repair more than 200 landslip sites on the Sunshine Coast, after flooding and flooding events in 2022.

The TMR spokesperson said there would be changed traffic conditions along Obi Obi Road, mainly from Monday to Friday between 6.30am and 6.30pm.

There were about 200 landslips in the region in 2022, including this one at Obi Obi. Picture: TMR.

“During works, heavy machinery will be accessing the work site and motorists may experience delays when a single-lane closure is implemented for the duration of construction, including outside work hours,” they said.

“Temporary traffic signals are in place to manage traffic flow during and outside work hours.

“Traffic controllers, reduced speed limits, road signage, and variable message signs are also in place to advise of the changed traffic conditions, and to ensure motorist and road worker safety.”

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

 

Subscribe to SCN’s free daily news email

This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share