100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Site investigations start for south-facing ramps at Mount Coolum

Do you have a news tip? Click here to send to our news team.

Public asked to help shape boat ramp upgrade

Community members have been invited to have their say on options to improve a popular boat ramp. The state government is seeking feedback on two More

Popular park gets playground upgrade

Families have a new reason to visit a popular community park, with a long-awaited playground upgrade now complete. The refreshed play space on King Street More

Bridge rebuild earns honours

A bridge rebuilt after severe weather damage has won a major engineering award. Noosa Council’s Schreibers Road Bridge Rebuild, delivered in partnership with Northlane Consulting More

UniSC study finds tactic that could slow bushfires

A University of the Sunshine Coast study has identified a potential way to help combat bushfires and give communities more time to prepare or More

New housing development proposed for beach town

Plans have been lodged for a residential development aimed at older Sunshine Coast residents looking to downsize without leaving their local community. Halpin Property Group More

Approval clears path for coastal unit project

An apartment development has been given the green light in a beachside community, with construction expected to begin next year. Sunshine Coast Council has approved More

Early planning is underway for a long-awaited upgrade to a section of the Sunshine Motorway, with site investigations fast-tracked to pave the way for new ramps.

The project is aimed at easing congestion, improving safety and providing an additional access point along a stretch of road that carries more than 31,000 vehicles daily, near Mount Coolum.

The state government has committed to deliver south-facing ramps to the motorway at West Coolum Road.

The site investigations represent the first step to inform planning and design for upgrades, and include detailed topographical, environmental and geotechnical surveys.

Minister for Transport and Main Roads Brent Mickelberg said the ramps would be of significant benefit.

“The project will support a future connection with Sunshine Coast Council’s proposed South Coolum Road Link project, ultimately providing an additional motorway access along this highly-trafficked section of motorway,” he said. “It is vital these projects are aligned for delivery as much as possible.”

“Traffic volumes are expected to increase as the Sunshine Coast continues to grow.

“These site investigations are an integral part of planning for future upgrades to ultimately improve traffic flow, travel-time reliability and safety on our roads.”

The state government is developing the project scope and timelines for the ramps.

Want more free local news? Follow Sunshine Coast News on Facebook, LinkedIn and Instagram, and sign up for our FREE daily news email.

The ramps would provide another connection between the motorway and Coolum.

Member for Maroochydore Fiona Simpson said the ramps would alleviate traffic jams.

“This major $40 million milestone will help divert through traffic off David Low Way and back onto the Sunshine Motorway, reducing the number of cars at existing choke points, as well as relieving pressure on dangerous local roads such as Toolga Street and Tanah Street West,” she said.

Member for Ninderry Dan Purdie said there was “light at the end of the tunnel” for people who use the section of the motorway every day but commuters could be temporarily impacted by works.

“We know to expect disruptions and I thank drivers in advance for their patience,” he said.

“The next step in delivering the broader plan to bust congestion is, of course, the duplication of the Sunshine Motorway between David Low Way and Yandina-Coolum Road to improve efficiency, capacity and safety.

“This planning includes provision for a grade-separated interchange at Yandina-Coolum Road and an active transport pathway.”

Motorists have been urged to allow additional travel time while site investigations are underway due to changed traffic conditions that will be in place for motorists and roadworker safety.

Temporary signage will be installed ahead of work starting to advise motorists of upcoming traffic changes. Visit 131940.qld.gov.au for updates.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share