100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Site investigations start for south-facing ramps at Mount Coolum

Do you have a news tip? Click here to send to our news team.

Veteran, 106, shares secret to long life

At 106, Sunshine Coast World War II veteran Richard Scott has a simple recipe for a long life: “A good wife, working hard, keeping More

Plans unveiled for Sunshine Coast’s tallest building

Plans have been revealed for a landmark 99-metre residential tower in the heart of the Sunshine Coast. Walker Corporation, which is leading the development of More

Toddler dies after being struck by vehicle

A toddler has died after being struck by a vehicle at a private address on the Sunshine Coast. Emergency services were called to Scholars Drive More

Marine plants to be removed for housing project

Thousands of marine plant plugs will be removed from land beside the Maroochy River under a new state government approval for a contentious 104-hectare More

Athletics track scorched amid damage to uni facilities

Sunshine Coast police are investigating after university sites, including the region’s top athletics track, were vandalised. Authorities are looking into incidents that occurred at the More

Joint sale highlights shift in property strategy

A Sunshine Coast real estate agent is encouraging homeowners in redevelopment areas to rethink the traditional way of selling, arguing that joining forces with More

Early planning is underway for a long-awaited upgrade to a section of the Sunshine Motorway, with site investigations fast-tracked to pave the way for new ramps.

The project is aimed at easing congestion, improving safety and providing an additional access point along a stretch of road that carries more than 31,000 vehicles daily, near Mount Coolum.

The state government has committed to deliver south-facing ramps to the motorway at West Coolum Road.

The site investigations represent the first step to inform planning and design for upgrades, and include detailed topographical, environmental and geotechnical surveys.

Minister for Transport and Main Roads Brent Mickelberg said the ramps would be of significant benefit.

“The project will support a future connection with Sunshine Coast Council’s proposed South Coolum Road Link project, ultimately providing an additional motorway access along this highly-trafficked section of motorway,” he said. “It is vital these projects are aligned for delivery as much as possible.”

“Traffic volumes are expected to increase as the Sunshine Coast continues to grow.

“These site investigations are an integral part of planning for future upgrades to ultimately improve traffic flow, travel-time reliability and safety on our roads.”

The state government is developing the project scope and timelines for the ramps.

Want more free local news? Follow Sunshine Coast News on Facebook, LinkedIn and Instagram, and sign up for our FREE daily news email.

The ramps would provide another connection between the motorway and Coolum.

Member for Maroochydore Fiona Simpson said the ramps would alleviate traffic jams.

“This major $40 million milestone will help divert through traffic off David Low Way and back onto the Sunshine Motorway, reducing the number of cars at existing choke points, as well as relieving pressure on dangerous local roads such as Toolga Street and Tanah Street West,” she said.

Member for Ninderry Dan Purdie said there was “light at the end of the tunnel” for people who use the section of the motorway every day but commuters could be temporarily impacted by works.

“We know to expect disruptions and I thank drivers in advance for their patience,” he said.

“The next step in delivering the broader plan to bust congestion is, of course, the duplication of the Sunshine Motorway between David Low Way and Yandina-Coolum Road to improve efficiency, capacity and safety.

“This planning includes provision for a grade-separated interchange at Yandina-Coolum Road and an active transport pathway.”

Motorists have been urged to allow additional travel time while site investigations are underway due to changed traffic conditions that will be in place for motorists and roadworker safety.

Temporary signage will be installed ahead of work starting to advise motorists of upcoming traffic changes. Visit 131940.qld.gov.au for updates.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share