100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

New section of path, beach showers, seats and more completed

Do you have a news tip? Click here to send to our news team.

Teenagers charged after alleged crime spree

An alleged machete-linked crime spree that included the theft of a vehicle from Alexandra Headland and ended with arrests on the Sunshine Motorway has More

Town centre outage forces shops to close

A pole-top fire has caused a major power outage in Nambour's town centre today, leaving businesses without electricity and forcing some to close. The incident More

Missing woman located deceased

The 57-year-old woman who was reported missing from Diddillibah on June 13 has been found deceased. Police said her death was not being treated as More

Revised designs released for foreshore revamp

New artist’s impressions and design details have been released for a major project along an exposed stretch of the Sunshine Coast. The community has been More

Preliminary works begin for major transport project

Preliminary works are underway on the southern end of the Sunshine Coast as activity ramps up on one of the region's most significant transport More

$400m investment renews key wastewater link

A key wastewater pipe serving thousands of Sunshine Coast residents has been renewed as part of Unitywater's $400 million infrastructure replacement and renewal program, More

A new 1km stretch of pathway by the beach is open to the public.

Walkers, riders and runners will be able to enjoy a wider and more accessible path, with ocean views and shaded areas, at Warana.

The section forms part of the 73km Coastal Pathway, from Bells Creek in the south to Coolum in the north.

Sunshine Coast Council completed the path between Beach Access 233 (Coonang Cresent) to BA 229, connecting to the existing network at Koorin Drive.

Revegetation of the verges will continue in the coming weeks.

Councillor Joe Natoli said council’s vision was for the Coastal Pathway to be a world-class scenic route, and that it was four years ahead of schedule.

The new section of path with seats and bike racks.

“These safe, connected pathways are great for residents to have some fun with family and friends, and it’s a really wonderful way of seeing the beauty of the coastline while staying active,” he said.

“The works (at Warana) include a kilometre-long, 3m-wide, concrete coastal pathway with accessibility access, two new beach showers, three new seats, two bike racks and more.

“The pathway provides people with the opportunity to explore the coast’s natural beauty.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

“Stage four was the last section in this area to be completed, meaning we have a continued 2km route from Minkara Street (BA 236) to Pike Park (BA 229).

“A scenic and easy walk or ride that would allow you to check out the new link would be from Kawana Surf Club to Bokarina and back. It would be a 5km return trip.”

A boardwalk has been included in the new stretch of pathway.

The council partnered with the state government, through the Department of Transport and Main Roads’ Cycle Network Local Government Grants Program, to deliver the section.

Scroll down to SUBSCRIBE for our FREE news feed, direct to your inbox daily.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share