100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Traffic changes take effect as major $301million interchange project ramps up

Do you have a news tip? Click here to send to our news team.

Long-running wedding venue seeks to expand offerings

Public notification is underway for proposed expansions at a hinterland wedding venue. Located just outside Maleny, the venue has been hosting weddings, functions and events More

Wedding Belles: morning vows kick off the perfect day

Ally Pettigrew and Bryce McFarlane’s wedding day started a little differently to most. They met at Mudjimba for breakfast and then, with their toes in More

Prominent beachside ‘boatshed’ to be replaced

A deteriorating landmark building at one of the region’s most popular beaches is set to be replaced. The Kings Beach surf lifesaving facility, positioned centrally More

Photo of the day: fading light

Kelly McKay took this shot at Cotton Tree. If you have a photo of the day offering, email photo@sunshinecoastnews.com.au. Photos must be horizontal/landscape and may More

Turf club could host metro races after scared horse concerns

Sunshine Coast Turf Club is on standby to host races from a major racetrack after a jockey boycott amid claims a nearby construction site More

Council votes to set aside land for future youth facility

A new community facility is closer to becoming a reality, after a parcel of land was set aside to build a Police Citizens Youth More

Three milestones have been reached on a $301 million upgrade to a busy interchange on the Bruce Highway.

Two enhanced exit ramps and a new, four-lane concrete bridge over the highway have opened to traffic, amid a revamp of the Mons and Maroochydore interchange.

Northbound traffic exiting the highway to Mons, Chevallum and Forest Glen is being directed onto the new Exit 200.

The old Exit 200 has now closed and drivers are being diverted 1.2km south to the new exit.

The new Exit 200 connects to a roundabout located at the intersection of Chevallum and Rainforest roads, which is part of a new western service road (Chevallum Road) taking shape.

The Bruce Highway Exit 200 to Mons and roundabout.

Another upgraded exit has also opened for southbound traffic accessing Maroochydore Road and Nambour Connection Road from the highway.

The upgraded Exit 201 is about 200m north of the old exit ramp.

Both upgraded exits are significantly longer and wider than the old ramps to provide more queuing space for traffic.

Meanwhile, traffic travelling from Maroochydore Road to Nambour Connection Road has been diverted onto the newly built Maroochydore Road interchange bridge – this temporary diversion will allow works to occur on the existing westbound bridge.

The parapets of the new bridge abstractly depict local references, including the nearby Big Pineapple, a Bunya Nut tree, and local indigenous history.

Synchronised traffic signals have also been installed at the Maroochydore and Nambour Connection Roads roundabout to improve safety and regulate traffic flow.

The eastbound bridge from Nambour to Maroochydore, over the Bruce Highway.

The signal phasing will be carefully monitored and adjusted over the coming months to ensure optimal safety and efficiency.

The temporary traffic switch will be in place for about three months, weather and construction conditions permitting.

New two-way service roads are also taking shape on the eastern and western sides of the highway for local traffic as part of the upgrade.

The project is funded by the Australian and Queensland governments on an 80:20 basis. It’s expected to be completed in mid-2023, weather and construction conditions permitting.

Plans for the intersection of Maroochydore Road, Nambour Connection Road and the Bruce Highway.

Federal Infrastructure, Transport, Regional Development and Local Government Minister, Catherine King, said it should significantly benefit commuters.

“It’s terrific to see work progressing so well on this major infrastructure project, which will make it safer and more efficient for people traffic to and from the Bruce Highway,” she said.

“Building a new bridge in a live traffic environment is no small feat, so I’m pleased to see work now complete and the bridge in use to the benefit of local motorists.”

Queensland Transport and Main Roads Minister Mark Bailey said the project provided “good local jobs”.

“Right here at the Mons and Maroochydore roads interchanges, the new Exit 200 and Exit 201 are significantly longer and wider making it safer when exiting the highway and reduce queuing.”

Plans for the intersection of Mons Road, Chevallum Road and the Bruce Highway.

Member for Nicklin Robert Skelton was pleased to see the new elements of the upgrade and work progressing.

 “What a great day to be a Sunshine Coaster when we can celebrate major infrastructure milestones like this,” he said.

“The new Exit 200 is thanks to the feedback provided by the local community when it was identified that the original northbound exit was of concern to drivers.

“Now, we’re well underway with construction and supporting about 380 good jobs right here on the Sunshine Coast.

“This is great news for contractors and suppliers in the region, and even better news for our booming local economy.”

Member for Caloundra Jason Hunt said more work was being done on roads around the region.

“(It) will keep Queensland moving and get locals home safer and sooner,” he said.

“Work is already underway on the major upgrade of the Bruce between Caboolture-Bribie Island Road and Steve Irwin Way (at Exit 163), and early works are progressing on Stage 1 of the Beerburrum to Nambour rail duplication.”

Plans for new roundabout and exit ramp for Chevallum Road and Bruce Highway.

For more information and to register for project updates, visit Department of Transport and Main Roads.

For up-to-date information on road closures and conditions across the state, visit Queensland Traffic, call 13 19 40 or download the QldTraffic app.

 

 

Subscribe to SCN’s Daily News

Hidden
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share