100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

A step in the right direction as badly damaged Coolum beach access to be replaced

Do you have a news tip? Click here to send to our news team.

Future of ‘well-loved’ attraction on the line

The long-term future of one of Queensland’s best-known heritage tourist attractions remains uncertain after the state government stopped short of ruling out major changes More

Palmer claims ‘politics’ led to $12m ASIC case

Clive Palmer has claimed that his political power led to criminal charges as he sought to adjourn a long-running case alleging he used company More

No plans for larger vessel infrastructure despite push

There are no plans to expand the infrastructure needed to accommodate bigger vessels on the Sunshine Coast despite rapid population growth and a push More

Driver fined twice for speeding within 10 minutes

A man has been fined after being detected speeding twice by Bruce Highway patrol officers in a short period of time. Police intercepted the 23-year-old More

Man charged over string of break-ins

A man has been charged with 28 offences after investigations into multiple break-ins across the Sunshine Coast. Police allege that the 28-year-old unlawfully gained entry More

Late-night drowning leaves man fighting for life

A man in his 20s has been assessed in a life-threatening condition following a drowning incident at Maroochydore Beach on Saturday night. Queensland Ambulance Service More

Coolum residents will soon be stepping down to the beach from a new set of robust timber and aluminium stairs, designed to look and feel similar to the existing set.

Work to replace the damaged stairs at beach access 77 is due to begin in October.

It comes after erosion earlier in the year revealed wood rot and other structural defects.

Sunshine Coast Council Division 9 Councillor Maria Suarez said council worked to keep beach accesses in good condition.

“An engineer’s review at beach access 77 stairs showed wood rot had damaged the structure,” Cr Suarez said.

“After considering the options, council decided that replacing the stairs with a new aluminium and timber set offered the best value for money.

“The new set will be strong, last a long time and require minimal maintenance.

The existing stairs copped a hiding from this year’s wild seas.

“It will still have timber treads and balustrades to keep that coastal texture and feel similar to the beach access 83 at Third Bay.

“The beach is an important part of our Sunshine Coast lifestyle and these designated entry points help to protect the dunes and coastal foreshore areas from erosion and damage.

“We thank the community for their patience while we work to restore safe access for our community.”

Construction is scheduled to start after school holidays and will be completed in approximately four to five weeks, weather dependent.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share