100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Parallel solution: new footbridge next to old road bridge gives residents safer passage

Do you have a news tip? Click here to send to our news team.

Wheelchair user stranded after taxi no-show

A wheelchair user missed his grandson’s baptism after a pre-booked taxi failed to arrive, prompting renewed calls for more wheelchair-accessible services. Phil Broad, 69, had More

New retail site helps fund vital services

A not-for-profit organisation, which supports individuals and families affected by cancer, has opened its 10th op shop on the Sunshine Coast. Bloomhill Cancer Care’s newest More

Man charged over string of break-ins

A man has been charged with 28 offences after investigations into multiple break-ins across the Sunshine Coast. Police allege that the 28-year-old unlawfully gained entry More

Free fair celebrates disability inclusion, community

A country fair celebrating connection and inclusion is set to return the hinterland this month. Now in its 14th year, A Fair Day Out has More

Late-night drowning leaves man fighting for life

A man in his 20s has been assessed in a life-threatening condition following a drowning incident at Maroochydore Beach on Saturday night. Queensland Ambulance Service More

From surf club fare to toasties: new venture opens

A new toasted sandwich outlet has opened on the Sunshine Coast, continuing the growing trend of businesses putting their own spin on the humble More

A much-anticipated pedestrian bridge has opened, allowing residents to safely traverse a narrow stretch of hinterland road.

The new $6 million footbridge at Seib Road, Eumundi, runs parallel to the existing road bridge and includes almost 300m of pathway and boardwalk.

It means pedestrians and cyclists no longer have to share the narrow road bridge spanning the North Maroochy River, which previously afforded less than a metre of shoulder.

Local residents had called for a safer pedestrian solution in the area for many years.

The Department of Transport and Main Roads (TMR) collaborated with Sunshine Coast Council in designing the project, with construction starting in January.

Council led construction on the Australian Government-funded the project, which means the bridge is now a council asset.

The highlight of the construction phase was when the 30.2-tonne bridge was lifted into place as a single component, requiring the overnight closure of the Eumundi-Noosa Road.

The 30.2-tonne bridge was lifted into place as a single structure.

The large single span was designed with the intent of minimising impacts to the waterway during flood events. The absence of pylons reduces the interruption to the flow of water and therefore minimises the impact on upstream river levels.

TMR North Coast deputy regional director Justin Valks said last year that the bridge would provide “safety and accessibility benefits for the Eumundi community”.

“The local community, including school-aged children, will be able to use the new pedestrian bridge to walk safely across North Maroochy River on Eumundi-Noosa Road into the township of Eumundi,” he said.

The bridge was painted off site with a protective paint system that is designed to last many years before any maintenance painting of the structure is required.

Want more free local news? Follow Sunshine Coast News on Facebook, LinkedIn and Instagram, and sign up for our FREE daily news email.

In addition to the pedestrian infrastructure, the project included safety improvements, including asphalt resurfacing and an improved right-turn facility for eastbound traffic turning into Seib Road.

A guardrail has been installed on either side of the road bridge spanning the river.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share