100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Church proposes expansion to allow for coffee dates and pickleball

Do you have a news tip? Click here to send to our news team.

New Police Beat’s early results revealed

A town centre Police Beat has marked six months of operation, with authorities reporting increased visibility and a focus on street crime and antisocial More

Pedestrian and motorcyclist killed in overnight crash

A woman and a motorbike rider have died following a crash at Warana on Saturday night. The Forensic Crash Unit is investigating the fatal collision, More

Major investment lays groundwork for thousands of homes

Significant funding has been announced for road and stormwater infrastructure expected to support thousands of future homes on the Sunshine Coast. The state government stated More

Pedestrian and cycle bridge officially opens

A $27 million bridge across a lake has officially opened and is expected to help unlock a future town centre. Developer Stockland unveiled the Birtinya More

Police investigate crash involving pedestrian

Police are investigating a serious crash on a major road that left a woman with life-threatening injuries. Initial investigations indicate that a 44-year-old woman was More

Police investigate serious crash

The Forensic Crash Unit is investigating after a serious traffic crash left a woman critically injured. Police said initial investigations indicated a grey Suzuki Ingnis More

A Coolum church is aiming to provide more facilities for the community by adding a youth hall and cafe.

Adapt Town Planning, on behalf of the Coolum Beach Baptist Church, has applied to the Sunshine Coast Council for a material change of use for an extension to a place of worship, community facilities and a food and drink outlet.

The church, on David Low Way at Coolum Beach, currently has approval for a place of worship and indoor and outdoor sports.

The extension would increase the floor area by more than third with the addition of a youth hall at the northern end of the current building.

A cafe with indoor and outdoor seating would be added at the north-east corner of the church, opening on to an existing playground.

Interim church coordinator Greg Blunden said the church facilities were already well used but the changes would allow it to be more self-contained and fill a gap in the area.

An overview of the plans for the church extension.

“We’ve got a number of community groups that use our facilities and what we want to do is offer them more rather than them have to go somewhere else,” Mr Blunden said.

“We’ve got playgroups with young mums and there is nowhere in Coolum that has a playground with a cafe.

“The idea is to have a cafe that mums can come to for a cup of coffee and there’s a playground that’s fully fenced, and they can sit there and watch while the kids go wild.”

Mr Blunden said the church facilities were currently used six day a week by mothers’ groups, playgroups, karate clubs and more, and the new hall would provide more space and flexibility.

The church extended its reach into the community when it established the Coolum Crusaders Soccer Club, and sees room to do more in the sporting realm with the new hall.

“With the sports hall, we’re looking at something else as well – pickleball. We’ll paint a pickleball court on the floor and with our car park out the back, we’ll put a pickleball court on that as well,” he said.

Mr Blunden said it was hoped the added venue would provide space for more young people to get involved in activities.

An impression of how the finished building could look.

“Some of these kids, we feel for them. We want to see them here once it’s done,” he said.

The new hall will have its own access but will connect through doors to the existing main hall of the building. It will be self-contained with a toilet and sink, and will have two small side room rooms.

“It will allow us to free up the big hall for other activities as well,” Mr Blunden said.

The church would end up with 65 car parks after the extension, 12 short of the required number for the facilities under the town plan, but a town planning report submitted with the application suggests that should not be an issue as different groups will use different parts at different times.

The report also points out that the church is on a public transport route with bus stop outside.

Mr Blunden said the church would wait for the application process to play out before a timeline was set for construction, but he anticipated it would be built in stages.

The church had already received some generous donations which would assist with the cost, he said.

Like stories that inform, connect and celebrate the Sunshine Coast? So do we. Join an independent local news revolution by subscribing to our FREE daily news feed at the bottom of this article

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share