100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Bridge design includes vehicle lanes and paths across lake

Do you have a news tip? Click here to send to our news team.

Dog owners renew call for secure park

More than two years after councillors received a 400-plus-signature request for a fenced dog park, a new petition is again pressing for a secure More

Overflow parking ruled out for holiday season

A foreshore park will remain public open space this Christmas rather than being used for overflow parking during the busy holiday period. Lions Park at More

Mall idea emerges amid town square transformation

Could a pedestrian mall be constructed in one of the region’s thriving coastal business centres? It can’t be ruled out, according to one Sunshine More

Parking changes divide residents in market area

A community group is calling for a broader rethink of traffic and parking after new restrictions on a narrow hinterland road left some residents More

Distinctive bridge at renowned waterfall to be replaced

A landmark pedestrian bridge at one of the Sunshine Coast’s most popular natural attractions is set to be replaced. The arched timber crossing that spans More

Upgrade to herald new chapter for library

Improvements are about to be made to a community facility that welcomes almost 150,000 visitors a year. Infrastructure works will take place at the Noosaville More

A new bridge designed to improve connections and support future growth has been proposed as part of a development application lodged with Sunshine Coast Council.

The proposed structure is planned for Central Boulevard at Birtinya, where it will provide a two-lane, two-directional vehicle crossing of Lake Kawana while also incorporating facilities for pedestrians and cyclists.

The Central Boulevard Bridge forms part of the broader Birtinya Town Centre development area, which is planned to include residential, commercial and community facilities.

The wider Birtinya precinct is expected to see Stockland deliver more than $350 million in works, including roads, bridges, parks and services.

Stockland and Sunshine Coast Council confirmed in April that the Birtinya Town Centre remains planned for 2600 residences.

The proposed bridge is intended to connect Development Planning Areas 11 and 13 and form part of the wider road network for the area. The application documents state the bridge will provide active transport facilities on both sides, including shared paths and cycling connections.

The Central Boulevard Bridge will be one of several links connecting the new town centre. Picture: Red Fox Advisory.

Design drawings show the bridge will include two traffic lanes, with shared paths provided on both sides of the structure. The plans identify shared paths measuring 3 metres wide, alongside cycling provisions that connect with the wider active transport network.

Council’s pre-lodgement advice noted the bridge is identified as a required element under the applicable master planning framework, with delivery triggered by future development milestones.

Landscape planning documents submitted with the application outline how the bridge will integrate with surrounding pathways and public spaces. The broader design approach includes connections between the bridge and existing or planned pedestrian and cycling routes.

Related stories: Major milestone reached for cable-stay bridge and Long-awaited 85m pedestrian bridge opens

Help us deliver more news by registering for our FREE daily news feed. All it requires is your email at the bottom of this article.

The proposed bridge will also include supporting services within the structure, including provision for a water main and communications conduits. Detailed design drawings show the bridge will span Lake Kawana with three spans supported by piers and abutments.

The application documents state the bridge design has been prepared in accordance with relevant bridge design standards and is intended to be delivered as a contributed asset to Sunshine Coast Council following completion.

The bridge is part of $350 million of planned infrastructure. Picture: Google Maps.

Council feedback during the pre-lodgement process sought further details about how the bridge would connect into the surrounding pathway network, including transitions between on-road cycling facilities and off-road cycle tracks. The applicant advised these details would be addressed through landscape architecture plans accompanying the application.

The proposal remains subject to assessment through the development application process.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share