100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Site investigations start for south-facing ramps at Mount Coolum

Do you have a news tip? Click here to send to our news team.

Couple appeals refusal of beachfront rebuild plans

An appeal has been launched in the Planning and Environment Court after a council rejected a couple’s bid to redevelop their beachfront property. Linda and More

Sunshine Coast back on top for regional migration

The Sunshine Coast has reclaimed its position as Australia’s number one regional migration destination for people moving from capital cities. The rapidly growing beach haven More

Ashley Robinson: Foiled again on the home front

I have written about retirement before and the implications it may have for me spending more time at home with Old Mate. There have been More

Photo of the day: blood moon

This photo of a rare blood moon on was captured by Dick Midgley in the early hours of September 8. If you have a photo More

Work about to start on plugging gaps in island

Emergency work is about to begin on filling two gaps in an island off the Sunshine Coast. A site compound is being established at Golden More

Toilets remain closed as authorities trade blame

The public toilets at one of the Coast’s main bus stations have been closed for months, reportedly due to vandalism, but the levels of More

Early planning is underway for a long-awaited upgrade to a section of the Sunshine Motorway, with site investigations fast-tracked to pave the way for new ramps.

The project is aimed at easing congestion, improving safety and providing an additional access point along a stretch of road that carries more than 31,000 vehicles daily, near Mount Coolum.

The state government has committed to deliver south-facing ramps to the motorway at West Coolum Road.

The site investigations represent the first step to inform planning and design for upgrades, and include detailed topographical, environmental and geotechnical surveys.

Minister for Transport and Main Roads Brent Mickelberg said the ramps would be of significant benefit.

“The project will support a future connection with Sunshine Coast Council’s proposed South Coolum Road Link project, ultimately providing an additional motorway access along this highly-trafficked section of motorway,” he said. “It is vital these projects are aligned for delivery as much as possible.”

“Traffic volumes are expected to increase as the Sunshine Coast continues to grow.

“These site investigations are an integral part of planning for future upgrades to ultimately improve traffic flow, travel-time reliability and safety on our roads.”

The state government is developing the project scope and timelines for the ramps.

Want more free local news? Follow Sunshine Coast News on Facebook, LinkedIn and Instagram, and sign up for our FREE daily news email.

The ramps would provide another connection between the motorway and Coolum.

Member for Maroochydore Fiona Simpson said the ramps would alleviate traffic jams.

“This major $40 million milestone will help divert through traffic off David Low Way and back onto the Sunshine Motorway, reducing the number of cars at existing choke points, as well as relieving pressure on dangerous local roads such as Toolga Street and Tanah Street West,” she said.

Member for Ninderry Dan Purdie said there was “light at the end of the tunnel” for people who use the section of the motorway every day but commuters could be temporarily impacted by works.

“We know to expect disruptions and I thank drivers in advance for their patience,” he said.

“The next step in delivering the broader plan to bust congestion is, of course, the duplication of the Sunshine Motorway between David Low Way and Yandina-Coolum Road to improve efficiency, capacity and safety.

“This planning includes provision for a grade-separated interchange at Yandina-Coolum Road and an active transport pathway.”

Motorists have been urged to allow additional travel time while site investigations are underway due to changed traffic conditions that will be in place for motorists and roadworker safety.

Temporary signage will be installed ahead of work starting to advise motorists of upcoming traffic changes. Visit 131940.qld.gov.au for updates.

Subscribe to SCN’s free daily news email

This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share