100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Funding to jumpstart planning for 'critical upgrades' to link road

Do you have a news tip? Click here to send to our news team.

Grassroots club secures upgrade

A Sunshine Coast football club regularly forced to close its fields after wet weather is set to receive an upgrade. Coolum Football Club will receive More

Outram defends crown in iconic race after illness

Electra Outram is savouring back-to-back wins in a famous surf sport race, after a disrupted lead-up. The Sunshine Beach local, who is a member at More

Parking changes divide residents in market area

A community group is calling for a broader rethink of traffic and parking after new restrictions on a narrow hinterland road left some residents More

Distinctive bridge at renowned waterfall to be replaced

A landmark pedestrian bridge at one of the Sunshine Coast’s most popular natural attractions is set to be replaced. The arched timber crossing that spans More

Upgrade to herald new chapter for library

Improvements are about to be made to a community facility that welcomes almost 150,000 visitors a year. Infrastructure works will take place at the Noosaville More

‘Shoes optional’ cafe brings riverside experience

A new cafe has opened at a familiar riverside site, with its signature focaccia sandwiches quickly becoming a customer favourite. River Kind has launched at More

A $7.1 million injection is set to fast-track planning for a town bypass.

The state government on Monday announced the additional funding for the Tewantin Bypass.

The cash will go towards planning work that is expected to unlock a long-term solution to improve safety and traffic flow within the Beckmans Road corridor, a 3.5km stretch between Cooroy-Noosa Road and Eumundi-Noosa Road.

The funding, on top of $1.4 million announced in the state budget, will enable in-depth investigations to be completed, confirm project benefits and economic viability, and consider staged delivery options.

The state government in 2022 completed upgrades, including the installation of a roundabout, at the intersection of Cooroy-Noosa Road and Beckmans Road.

But Transport and Main Roads Minister Bart Mellish said more would be done.

The roundabout at the intersection of Cooroy-Noosa Road and Beckmans Road, which was stage one of the Tewantin Bypass.

“Now, we’re getting on with planning future stages,” he said.

“This funding will now fast-track the completion of the business case, to consider critical upgrades that boost capacity, address growing traffic demands and future proof the road network.”

Member for Noosa Sandy Bolton in August urged the government to get moving on detailed design.

She said on Monday that the funding was “fantastic news”.

The project area along the Beckmans Road corridor.

“With stage one at the intersection of Beckmans Road and Cooroy-Noosa Road already complete, this fast-track will mean once the detailed designs and business case are completed, we can get to construction funding stage,” she said.

“This is vital as I have raised previously, given not only existing congestion, but as well the projected population increases to the south and the visitations due to the 2032 Olympic and Paralympic Games.”

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share