100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Qld Govt clarifies modified interchanges at $300m Bruce Highway upgrade site

Do you have a news tip? Click here to send to our news team.

Wildlife advocate receives top community award

A conservationist who has rescued countless native animals and raised vital funds for wildlife care and habitat protection has received one of the region's More

Seven charged with 105 drug-related offences

Seven people have been charged with 105 offences linked to drug trafficking and supply as part of a sweeping police operation in an area More

New school to rise in region’s fastest-growing area

A new state primary school will be built in a rapidly expanding community on the Sunshine Coast. About 1140 students are set to attend the More

Tyred and tested: pothole saga leaves driver deflated

A resident in a Sunshine Coast estate claims the local council ignored his plea to fix a giant pothole before he blew out a More

Extension planned for hinterland retail hub

The operator of a hinterland shopping complex has applied for an expansion under a proposed minor change to its existing development approval. The proposal for More

Inspectors target dozens of eateries in wage compliance blitz

Fair work inspectors have returned to bustling food precincts at a tourism hub to check for underpayments. They are examining fast food outlets, restaurants and More

Any confusion over the design of new Bruce Highway interchanges at Maroochydore Road, Nambour Connection Road, and at Forest Glen and Chevallum, have been put to rest by the Department of Main Roads and Transport.

The jointly-funded $301.25m highway project includes upgrading the Maroochydore Road and Mons Road interchanges and providing two-way service roads on the eastern and western sides of the highway for local traffic.

SUBSCRIBE here now for our FREE news feed, direct to your inbox daily!

Artist’s impressions released by the department have given some insight into motorist access to the highway from Sandalwood Lane, on the eastern side of the highway, and to the highway from Leafy Lane on the western side.

The DTMR said, “a key component of the major transport upgrade involves connecting the Maroochydore Road and Mons Road interchanges via two new service roads on the eastern and western sides of the Bruce Highway.

“The new western service road (to be known as Chevallum Road between Mons Road and Leafy Lane) will initially open to northbound traffic only.

“This means the existing northbound highway entry ramp from Mons Road will permanently close, and instead motorists will use the new western service road to access the Maroochydore Road interchange and Bruce Highway northbound.”

A diagram showing how motorists can exit from Chevallum Road to either enter the highway or continue along Leafy Lane towards Nambour Connection Rd and Maroochydore Rd. Picture DTMR.

The DMR noted that the full opening of the western service road (for northbound and southbound traffic) is expected in early 2023.

Meantime, DTMR added that, “the eastern service road will also progressively open to traffic, with southbound traffic initially travelling on a new section between Mons Road and the Maroochydore Road interchange.

“The existing southbound highway exit ramp (Exit 200) to Mons Road will permanently close.

“Motorists will use the Maroochydore Road interchange to access the eastern service road and the Forest Glen, Mons and Chevallum areas. Full opening of the eastern service road is expected in early 2023.”

A diagram showing how vehicles travelling south on the Bruce Highway will be able to exit onto Sandalwood Lane at Forest Glen, which will also connect them to Buderim and Tanawha. Picture: DTMR.

The new access arrangements are expected to make it safer for motorists entering and exiting the Bruce Highway as well as cater for additional traffic.

Signs will be in place to direct motorists to the changed conditions and motorists are reminded to obey reduced speed limits and pay attention to changed traffic conditions.

Traffic travelling to Nambour will use the upgraded westbound bridge over the Bruce Highway with traffic travelling to Maroochydore travelling over the new bridge at the Maroochydore Road interchange.

These are permanent traffic changes, however some lanes will remain temporarily closed to finish construction work. Traffic signal phasing will be reprogrammed and monitored.

After this, new service roads on the western and eastern side of the highway will gradually open to traffic.

This project is jointly funded, with the Australian Government contributing $241m and the Queensland Government contributing $60.25m.

“As one of Queensland’s busiest highways, the additional capacity and safety this project will deliver will be welcomed by locals, tourists and commuters alike,” Member for Nicklin Rob Skelton said.

For more information and to register for project updates, visit Bruce Highway Upgrade – Maroochydore Road and Mons Road Interchanges.

For up-to-date information on road closures and conditions across the state, visit Queensland Traffic, call 13 19 40 or download the QldTraffic app.

Do you have an opinion to share? Submit a Letter to the Editor with your name and suburb at Sunshine Coast News via: news@sunshinecoastnews.com.au

 

Subscribe to SCN’s free daily news email

This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share