100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Council to start building 'missing' segment of coastal pathway in Caloundra

Do you have a news tip? Click here to send to our news team.

Suburb sets trend as prize home winners choose to stay

A Sunshine Coast suburb is bucking the usual prize home trend, with recent lottery winners choosing to move in and stay put. The Endeavour Foundation More

Industrial park powers ahead amid calls for road upgrades

Work is ramping up on a major expansion of an industrial hub that could inject $65 million a year into the Sunshine Coast economy, More

Rates to increase as ‘challenging’ $202m budget adopted

A $202m local council budget will see significant funds set aside for roads, bridges and facilities but it will come at an increased cost More

Planning ‘ramps’ up for new beach access

Plans are afoot for an all-abilities access ramp at a popular beach as Sunshine Coast Council undertakes to make it accessible to all. The new More

Photo of the day: river shack sunrise

Sunrise over the Maroochy River, where an old fishing shack is being repaired. Sandy Gillis observed the scene. If you have a photo of the More

Police confirm identity of man found in river

Police have identified a man whose body was found in a Sunshine Coast river more than 18 months ago. He has been identified as a More

Work is about to start on part of the ‘missing link’ along the popular coastal pathway that stretches from one end of the Coast to the other.

A new 500m section between Dicky Beach and Moffat Beach will be built along the foreshore, giving pedestrians and cyclists views over the ocean.

To date, the existing footpath has deviated away from the beach and travelled alongside cars on busy Elizabeth Street.

The new route will be built between Cooroora Street to Dicky Beach Park at Beerburrum Street.

It is part of a larger 3.2 km segment between Currimundi Beach and Moffat Beach considered a ‘high priority missing link’ in the Coastal Pathway Master Plan.

The full pathway network is 73km, extending from Bells Creek in the south to Coolum in the north.

Sunshine Coast Council Division 2 Councillor Terry Landsberg said he was pleased preliminary works would start on Wednesday.

“Following on from the Dicky Beach Precinct Plan Stage 1 completion last year, I’m glad to see this section of the Dicky Beach Coastal Pathway being delivered for the benefit of our community,” Cr Landsberg said.

“When enjoying a walk, cycle or stroll at Dicky Beach, residents and visitors will be able take advantage of the beauty of our coastline, rather than travel along Elizabeth Street.

“As part of the works, two new car spaces and an extra motorcycle bay at the Lower Neill Street carpark will also further benefit our community.”

Council will provide updates to locals and businesses to keep them across construction timeframes and localities.

Meanwhile Stage 1 of the Warana Coastal Pathway (above) has been completed.

The pathway stretching from Beach Access 236 and 235, between Minkara Street and Langura Street, was reconstructed and is now open to the community.

Stage 2 works are currently underway and are expected to be completed by late-April, pending material supply and weather conditions.

Stage 1 was constructed in partnership with council and the Department of Transport and Main Road’s Cycle Network Local Government Grants Program.

For more information about construction stages and timeframes, please visit Council’s website and search ‘Warana Coastal Pathway’.

Dicky Beach Coastal Pathway Upgrades include:

  • A new 3m-wide concrete coastal pathway at ground level
  • Three new park seats
  • Two new picnic tables
  • Bike racks at Beach Access 269 (Lower Neill Street carpark)
  • Two extra car parks and motorbike bay to the Lower Neill Street carpark
  • Dunal revegetation and weed clearing
  • Completion is expected by mid-July 2022 (weather and site conditions permitting).
  • Works will be undertaken in three stages to minimise inconvenience to residents and visitors and retain as much access to the foreshore as possible.

Subscribe to SCN’s free daily news email

This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share