100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

20,000 cars daily: upgrade design complete for 'hot spot' intersection

Do you have a news tip? Click here to send to our news team.

Vehicle bursts into flames on highway

A utility caught fire on the Bruce Highway in peak-hour traffic, causing delays for motorists. The incident, involving a Ford Ranger, occurred on the northbound More

Residents raise alarm over machinery dealership near koala habitat

A machinery dealership is under fire from residents who say it is putting a sensitive environmental area and koala habitat at risk, while council More

Revamped intersection to form gateway to new community

A busy intersection is about to be upgraded to improve traffic flow and prepare for the future growth of an area. The T-junction of David More

Man dies after mower incident

A man has died after an incident involving a mower on the Sunshine Coast. Police will prepare a report for the coroner following the non-suspicious More

Turtle hatchlings’ chances bolstered by volunteers

Thousands of turtle hatchlings from the northern beaches of Bribie Island have made it safely to sea, after being monitored by a local conservation More

Massage therapist charged with more alleged sex offences

A man has been charged with additional sex offences following an appeal launched last month by detectives from the Sunshine Coast Criminal Investigation Branch. A More

Design work is now complete for a project to upgrade the Mooloolaba Road and Sugar Road intersection, where Buderim and Alexandra Headland meet.

The re-design includes reconfiguration of traffic lanes to increase capacity at what is an often busy and congested interchange.

It also includes additional dedicated, left-turn lanes to improve efficiency for vehicles turning from Sugar Road to Mooloolaba Road and from Mooloolaba Road to Sugar Road.

“This is a known pinch point, so recognifuring the lanes will allow for more vehicles to travel in both directions on the Mooloolaba Road bridge,” Transport and Main Roads Minister Mark Bailey said of the redesign work.

Design plans to improve the Mooloolaba Road and Sugar Road intersection, at Maroochydore.

“Drivers turning right to enter Sunshine Motorway southbound, or to enter Sugar Road northbound, will also benefit from the new configuration.

“Additional dedicated, left-turn lanes will improve efficiency for vehicles turning from Sugar Road to Mooloolaba Road and from Mooloolaba Road to Sugar Road.

“These congestion-busting features will help reduce travel times and make it safer for all road users.

Do you have an opinion to share? Submit a Letter to the Editor with your name and suburb at Sunshine Coast News via: news@sunshinecoastnews.com.au

“We will need to widen both roads at particular spots to accommodate the additional lanes, while road resurfacing will also be undertaken.”

Minister Bailey said a dedicated, on-road bike lanes and an off-road bike path westbound on the bridge would be built.

“We’ll also install signalised pedestrian crossings at the Mooloolaba Road and Sunshine Motorway southbound exit ramp intersection and at the Mooloolaba Road and Sugar Road intersection to make it safer for people walking through the area,” he said.

“Construction is programmed to begin mid-2023, weather and construction scheduling permitting.

A closeup of part of the upgrades planned for the Mooloolaba Road and Sugar Road intersection.

“We’ll give local residents and road users ample notice before any construction work begins next year.”

Mr Bailey said the interim upgrade would improve safety while large planning work was undertaken.

“We know the Sunshine Coast is growing rapidly, and we need to improve transport connections to keep people moving,” he said.

“That’s why we are currently planning for the Buderim Mooloolaba Interchange project, to increase capacity at this key intersection.

“In the meantime, we’re getting on with improving safety and efficiency at the existing interchange for the 20,000 drivers who use this road daily.

“Our investment means you will get home safer and sooner, to spend more time with family and friends enjoying Queensland’s great lifestyle.”

TMR said this interim project would improve safety and capacity at the Mooloolaba Road and Sugar Road intersection while planning work continued for the larger Buderim Mooloolaba Interchange project.

Preliminary planning for this future interchange is expected to be complete by mid-2023 (2023).

Local journalists supporting local people. Help keep independent and fair Sunshine Coast news coming by subscribing to our free daily news feed. All it requires is your name and email. SUBSCRIBE here now.

 

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share