100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

$8 million in upgrades to short stretch of Caloundra Road to start in April

Do you have a news tip? Click here to send to our news team.

Renowned structure at main beach set for overhaul

A prominent facility at one of the Sunshine Coast’s busiest beaches is set for a change, with council seeking community feedback on its future. The More

Markets pump $54m into Coast economy each year

The Eumundi Markets have been confirmed as a tourism powerhouse for the Sunshine Coast, with a new independent report revealing the iconic attraction generates More

Crushed turtles prompt warning to stay off dunes

Drivers are being asked to show care on beaches after turtle hatchlings were reportedly found crushed in vehicle tracks. Loggerhead and green turtles are in More

Coast to host trans-Tasman Test on Anzac Day

The Sunshine Coast is set to host a historic Test match featuring the Australia and New Zealand women's rugby teams on Anzac Day. The Wallaroos More

Jane Stephens: feeding our pet peeves

There are countless seemingly harmless things others do that can trigger strong reactions. And while it is one thing to be annoyed by someone More

Prominent lawyer hits career milestone ‘for six’

After 25 years of dedicated service to the Sunshine Coast community, respected local lawyer Chris Baker will retire at the end of February, marking More

Night roadworks will begin on one of the Coast’s most congested main thoroughfares as part of $8 million in upgrades.

The work will be done from this month on a 1km stretch of Caloundra Road, from the Nicklin Way roundabout through to Bulcock Street.

“Caloundra Road is a busy urban-arterial route connecting Caloundra with the Bruce Highway and Nicklin Way — the section through the CBD caters to over 25,000 motorists each day,” said Member for Caloundra Jason Hunt.

“These works will not only improve the road surface but also reduce ongoing maintenance costs and provide smoother driving conditions.”

Mr Hunt said due to heavy traffic, works would be carried out at night, between 6pm and 7am, from Sunday to Thursday.

“We will also upgrade the traffic signal controller, signal lanterns and install CCTV at the Bulcock Street and Bowman Road intersection,” he said.

“This technology will improve traffic management by enabling Transport and Main Roads to remotely monitor this busy intersection and adjust signals when needed.

“Every effort will be made to keep disruptions and noise to a minimum while works are undertaken.

“Single-lane closures, traffic controllers, reduced speed limits and signs will be in place to ensure road worker and motorist safety.”

Caloundra Road approaching the Nicklin Way roundabout. Picture: Google Maps

He said the rehabilitation was part of the Palaszczuk Government’s record $27.5 billion four-year roads and transport plan for Queensland

Mr Hunt said other Sunshine Coast works included:

  • $932 million Bruce Highway Caloundra Road to Sunshine Motorway upgrade
  • $320 million Sunshine Motorway Mooloolah River Interchange Upgrade, Stage 1
  • $301.25 million Bruce Highway Maroochydore Road and Mons Road Interchanges (under construction)

“As always, motorists should observe all directions when approaching road works and adapt their driving to the changed conditions.

“We thank the community in advance for its patience and cooperation during this essential upgrade.”

For up-to-date information on road works and conditions across the state, visit www.qldtraffic.qld.gov.au, call 13 19 40 or download the QldTraffic app.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share