100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Council backs approved plans for new Currimundi Hotel cabins

Do you have a news tip? Click here to send to our news team.

Dog owners renew call for secure park

More than two years after councillors received a 400-plus-signature request for a fenced dog park, a new petition is again pressing for a secure More

Overflow parking ruled out for holiday season

A foreshore park will remain public open space this Christmas rather than being used for overflow parking during the busy holiday period. Lions Park at More

Mall idea emerges amid town square transformation

Could a pedestrian mall be constructed in one of the region’s thriving coastal business centres? It can’t be ruled out, according to one Sunshine More

Parking changes divide residents in market area

A community group is calling for a broader rethink of traffic and parking after new restrictions on a narrow hinterland road left some residents More

Distinctive bridge at renowned waterfall to be replaced

A landmark pedestrian bridge at one of the Sunshine Coast’s most popular natural attractions is set to be replaced. The arched timber crossing that spans More

Upgrade to herald new chapter for library

Improvements are about to be made to a community facility that welcomes almost 150,000 visitors a year. Infrastructure works will take place at the Noosaville More

A Sunshine Coast hotel has defended a row of new accommodation cabins after the development divided community opinion.

The Currimundi Hotel at 32 Buderim Street, Battery Hill, is the site of the approved development, which was lodged by Queensland Venue Co.

The hotel is building 32 one-bedroom short-term accommodation units to complement its existing motel-style accommodation.

The approved plans also include a heated swimming pool and jumping pillow, with conditions covering landscaping, screening, noise management and operating hours for these areas.

A Currimundi Hotel spokesperson said the accommodation was designed to meet demand for short-term stays.

“The cabins will help meet clear demand for affordable visitor stays, with the hotel’s existing accommodation regularly reaching full occupancy,” they said.

“Landscaping and screening form an important part of the approved plans, including a landscaped buffer along Buderim Street that will enhance its visual appeal.

“Screen planting, garden beds, and additional trees and shrubs will surround the accommodation and guest areas creating a greener, shaded setting for guests.”

The Currimundi Hotel accommodation development is still under construction, with verandas, roof overhangs and landscaping yet to be installed. Picture: Currimundi Hotel/Facebook

While construction is still underway, the development has attracted criticism from some community members, who have questioned its appearance and design.

On Facebook, Jayne Franke said: “Currently they look very ugly and are an eyesore. The community feels it will be housing for homeless. I’m hoping they will look great when finished, just for my own eyes. But one-bedroom stays? What’s the point of a jumping pillow? How is this listed as a resort and expect a family to stay in there?”

Edie Robinson said: “I reckon a bit of an eyesore from Buderim Street. Hopefully huge fence or tall hedge streetside”.

Paul Schloss said: “Looks like a mining camp”.

However, not everyone has criticised the development, with some community members highlighting its potential benefits for visitors and local businesses.

Cinnamon O’Shanesy said: “I love this. The cost of building these days is so expensive, so I think the demountable accommodation is a fantastic option. It will be a great asset for sporting events such as touch, OzTag and surf carnivals, as well as supporting local tourism/businesses. Hopefully it also provides some affordable accommodation options for families visiting the area. The landscaping is going to look fantastic once it’s all established too”.

The Landscape Concept Plan for the Currimundi Hotel accommodation development. Picture: Urbis

The hotel said cabins have been designed in a familiar style seen in many tourism destinations and holiday parks.

“The project is progressing in line with its approved development plans and conditions, with works expected to be completed in late September,” they said.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

Councillor Terry Landsberg said he had asked council to follow up on the required setback to Buderim Street and conditions imposed on the project after receiving interest from the community.

A Sunshine Coast Council spokesperson said council was aware of concerns about the development while construction was underway.

“Council has reviewed the development and confirmed the front setback is 4.2 metres from the Buderim Street property boundary, in accordance with the approved plans,” they said.

“The development is not complete, with approved verandas, roof overhangs and landscaping still to be installed.

“These elements, including landscaping exceeding two metres in width, are intended to soften the appearance of the buildings and enhance the site’s presentation from the street.

“Council is satisfied the development is progressing in accordance with the approved plans and conditions.

“Council will continue to monitor the project through its standard compliance and certification processes to ensure all approved works are completed before the development is finalised.”

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share