100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Major works improve long-term stability of historic trail

Do you have a news tip? Click here to send to our news team.

New Police Beat’s early results revealed

A town centre Police Beat has marked six months of operation, with authorities reporting increased visibility and a focus on street crime and antisocial More

TV stalwart takes centre stage

One of Australia’s most beloved icons will tell a powerful story of life, loss and letting go on a Sunshine Coast stage later this More

Legacy plan maps out Games benefits for region

A new action plan has outlined how the Sunshine Coast hopes to turn the 2032 Olympic and Paralympic Games into long-term benefits for the More

Demolition clears way for beachside tower

Demolition at a prominent beachside site has cleared the way for an 11-storey apartment tower approved to rise almost 5m above the current height More

Plans lodged for affordable housing project

A development application for an accommodation complex aimed at providing more affordable housing has been lodged with Sunshine Coast Council. The proposal would see two More

Hospital parking spillover sparks council review

Parking overflow from a major Sunshine Coast hospital is being reviewed, with council analysing survey results to find solutions to congestion concerns in surrounding More

A popular Sunshine Coast heritage trail has been improved so people can enjoy it for years to come.

The Buderim-Palmwoods Heritage Tramway Walk received a recent revamp, with three walls installed to repair a landslip and stabilise the corridor.

The upgrade followed various other improvements from 2022 to 2024.

A Sunshine Coast Council representative said the trail was preserved and user friendly.

“Sunshine Coast Council has undertaken a series of works in recent years to help protect and maintain the walk, ensuring this valued community asset remains safe and accessible for residents and visitors.”

“Recent works have focused on repairing stormwater infrastructure and addressing erosion and landslip issues along the trail.”

A section of the Buderim-Palmwoods Heritage Trail.

Works have included: the installation of cured-in-place pipe liners at seven stormwater sites, extending the life of existing drainage infrastructure, in 2022; replacement of a stormwater pipe beneath the trail at site 21, with access from Liana Place, in 2023.

Improvements have also included the extension of an existing stormwater pipe and construction of a new headwall at site 16, along with scour protection works including installation of a concrete spoon drain across the trail; and the resurfacing of about 1km of the trail to improve accessibility and user experience.

Most recently, the three retaining walls were installed, giving the trail a different look.

Help us deliver more by registering for our FREE daily news feed. All it requires is your email at the bottom of this article.

A section of wall that was recently installed.

“The most recent works addressed a landslip that had impacted the trail corridor. Other projects have focused on repairing and renewing ageing stormwater assets beneath and adjacent to the trail,” the spokesperson said.

“These proactive works help protect the trail, improve drainage performance and reduce the risk of future erosion or infrastructure failures.”

The various projects have been delivered over several years as part of the council’s ongoing asset maintenance and renewal program. Stormwater repair projects along the corridor have collectively been in the order of about $450,000, including investigations and works at multiple drainage sites.

More work was expected along the 4.2m route.

The Krauss in action near Buderim in about 1920. Picture: Picture Sunshine Coast.

The council has identified additional drainage assets along the corridor that require renewal and will continue progressing these works as funding becomes available.

The council has also been working with the Buderim Palmwoods Heritage Tramway Association to explore opportunities for future improvements, including trail surfacing and drainage upgrades.

The trail is a tribute to a key phase of the region’s history.

It follows part of the former Buderim-Palmwoods tramway corridor, which played an important role in the development of Buderim and the wider region.

The site of the old Mons Station, along the Buderim-Palmwoods Heritage Trail.

There were two trains (the Shay and the Krauss) that ran along the line, between 1914 to 1935, which opened the region to trade and tourism.

But the line was essentially abandoned due to the expansion of roads.

The corridor is now protected as a bushland trail and provides an opportunity for visitors to experience the area’s natural environment and its transport heritage.

The trail features interpretive signage, seating areas and sections where remnants of the original rail infrastructure can still be seen. It is located within council-managed parkland known as Buderim-Palmwoods Heritage Trail Bushland Park.

The entrance to the Buderim-Palmwoods Heritage Trail.

The main entrance point is at Telco Road.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share