100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Wind farm proposal with 226 turbines spanning three regions ditched after community feedback

Do you have a news tip? Click here to send to our news team.

Riverfront ‘masterpiece’ crowned region’s top home

A waterfront residence with "extraordinary craftsmanship and innovation" has been recognised with multiple accolades at the Master Builders Sunshine Coast Housing & Construction Awards. Azura, More

Measles alert fuels calls to ease health system pressure

A Sunshine Coast pharmacist has warned a measles outbreak could place more pressure on the region’s already stretched hospitals as new research points to More

Music for mental health unites Coast’s youth

A Sunshine Coast festival focused on youth wellbeing is putting young performers at the centre of its biggest program yet. Nurture Festival returns to the More

Revamped stretch of path, new viewing platform opened

A large section of walkway has been renewed and opened to the public at one of the Sunshine Coast’s most well-known locations. The stretch of More

Bridge works hit milestone as next traffic switch looms

A major bridge upgrade has reached a key milestone, with crews completing a concrete pour this week as work continues on a project expected More

Your say: Maleny Dairies, station design and more

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name More

A wind farm north of the Sunshine Coast that was set to power almost 500,000 homes has been abandoned, raising concerns for the future of renewable projects under a state coalition.

The 1200-megawatt Forest Wind project was to have been constructed in state forests in Gympie, Maryborough and the Fraser Coast, potentially delivering power for one in four homes in the state.

However, Queensland’s Liberal National government has scrapped the project, which would have featured 226 wind turbines standing up to 160m, citing community and approval concerns.

Deputy Premier Jarrod Bleijie said the government would repeal legislation passed by the former Labor government in 2020 that gave the green light for turbines to be constructed in state forests.

Mr Bleijie said the project had created “fear and anxiety” in the respective communities, with residents reportedly claiming there had not been enough public consultation before it was approved.

The state government said the project’s venture partner had also withdrawn in August 2024.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

The withdrawal and the “loss of landholder support” ensured the wind farm failed to meet minimum project requirements to allow it to proceed, the government said.

Conservationists have raised concerns after the state government knocked back another renewable project.

The former Labor government’s Pioneer-Burdekin pumped-hydro scheme was canned shortly after the LNP won the October 2024 election.

Deputy Premier Jarrod Bleijie addresses media.

The LNP government will also no longer track how much renewable energy is contributing to the grid, calling it a “discontinued measure” in its June budget.

“The Crisafulli government’s move to prematurely axe Forest Wind is just another indication that they’re putting ideology over the practical need to build renewable energy to get down emissions and power bills,” Queensland Conservation Council’s Dave Copeman said.

A recent LNP national convention in Queensland voted unanimously to pass a resolution to abandon net zero by 2050.

The federal coalition is reviewing its emissions reduction policies and the House of Representatives is debating Barnaby Joyce’s private bill to dump Australia’s net-zero target.

The Queensland government’s decision comes after a $10 billion wind farm set to generate 2000 megawatts of capacity off the NSW coast was scrapped in August after a Norwegian energy giant pulled out.

Mr Copeman said the Queensland wind farm’s proposed area was suitable for construction.

“We want to see renewable energy projects built in the right locations where there is minimal impact on the environment,” he said.

“Pine plantations are key areas we should look to build projects because the local biodiversity has already been severely impacted.”

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share