100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

New facility to be 'a place of hope, connection and growth for everyone'

Do you have a news tip? Click here to send to our news team.

Flood damage forces partial closure of national park

Parts of a popular national park, including a section of track near a renowned waterfall, are temporarily closed due to damage from flash flooding. Recent More

Photo of the day: nature’s imagination

“Art in nature has turned a barnacle-covered tree root into a 'mythical creature’ along our new Bribie Island beach walk,” writes Ruth Fiechtner. If you have More

Officers injured in motorway gel blaster incident

A man has been arrested after allegedly pointing a gel blaster at police. A police spokesperson said officers were called about 10.20am today to the More

‘Sandstorm’ beach blitz nets over 270 fines

Police have cracked down on dangerous beach driving at a holiday hotspot by issuing more than 270 fines in eight days. Sunshine Coast police, including More

Ashley Robinson: the famous v infamous

I was filling in at Sea FM the other morning while the brekky crew were on holidays. Ever-patient professional announcer Bec Turnbull tossed up to More

Work starts on $80m retail centre as tenants revealed

Construction has started on a large retail hub in one of the Sunshine Coast's fastest-growing areas. The first sod was turned on the Aura Home More

Works are about to start on a lakeside facility that will finally provide a church with a permanent home.

Hm.church has announced that construction on its facility on Sportsmans Parade at Bokarina will get underway in November.

It has operated without a fixed base for two decades. Services have been held at the Chancellor Park Tavern, Venue 114 and the Kawana Waters State College auditorium.

The construction project for its own facility has gone through a lengthy approval process and rising building costs, which led to multiple design adjustments.

A Hm.church spokesperson said the changes had resulted in a more efficient and sustainable design.

“We’ve worked hard to maintain a high-quality finish and adjust for the increasing costs, ensuring that this space will meet the growing needs of our congregation and the community,” they said.

An impression of the Hm.church building.

A media release stated that the facility was made possible by the persistence of the church and the generosity of its supporters.

Donations from the congregation have provided essential funding to move forward, allowing the church to break ground this year with plans to complete construction within 12 months.

“This is more than just a building, it’s a home for our community, a place where families, individuals and students can come together,” the spokesperson said.

“We’re excited to offer not only Sunday services but also evening workshops, mothers’ groups and even funeral services.

Hm.church members at the construction announcement.

“This church will be a place of hope, connection, and growth for everyone in the community.”

The new facility will be across the road from Kawana Waters State College.

Through its chaplaincy support, the church will be able to support the families of more than 2000 students.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

Subscribe to SCN’s free daily news email

Hidden
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share