100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Work about to commence on resurfacing busy road into tourist mecca

Do you have a news tip? Click here to send to our news team.

Key coastal protection works completed

A multimillion-dollar project has strengthened defences against erosion and storm impacts along a vulnerable stretch of beach. A seawall has been reconstructed at Golden Beach, More

Fuel station proposed for town centre hub

The next stage of a major development has been put before council. Detailed plans have been lodged for a proposed service station at 10 Memorial More

Hinterland hotel wins Queensland crown

An historic and iconic hinterland hotel, which recently underwent a $5m renovation, has claimed one of Queensland hospitality’s top honours. The Imperial Hotel Eumundi was More

Your say: rates hike, e-bike crackdown and more

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name More

Time called on coaching chapter

One of the region's most accomplished coaches is preparing to close a significant chapter in a career spanning more than two decades. Sunshine Coast Lightning More

Long-running surf retailer enters administration

A business that helped shape generations of Sunshine Coast surfers, including 2012 world champion Joel Parkinson, has entered administration, ending a 40-year chapter. Much-loved retail More

Rehabilitation and resurfacing works are about to commence on one of the Coast’s busiest roads.

The Department of Transport and Main Roads will soon begin the works on Caloundra Road between Little Mountain and Caloundra, providing a new road surface for the 50,000 motorists who use the road each day.

Repairs will also be carried out on the guardrails at the Duck Holes Creek, near Industrial Avenue on Caloundra Road.

Works are scheduled to begin later this month and are expected to take about four months to complete, weather and construction conditions permitting.

Works will not be conducted during the Christmas and New Year period between mid-December and early January.

Transport and Main Roads Minister Mark Bailey said the resurfacing was important to Caloundra’s tourism industry.

“Caloundra is and always has been a popular tourist destination, and the pristine beaches of Kings, Moffats and Caloundra attract thousands of holidaymakers, which is why this important rehabilitation and resurfacing works are being prioritised,” he said.

A map showing the location of the works on Caloundra Road. The blue dot indicates where the guardrails will also be repaired. Picture: TMR

“The key to economic growth in any region is safe and efficient transport links and that is why the Queensland Government is planning for the future by upgrading both carriageways, which will assist the commercial and tourism industries to continue to thrive.

“In an effort to reduce impacts to nearby businesses and residences, we’ve ensured these works are undertaken in the evenings between 7pm and 6am, Sunday to Thursday, and will not be conducted during the Christmas shutdown period between mid-December 2023 and early January 2024.

“These works will be carried out between Sugar Bag Road and the Nicklin Way roundabout intersections, and traffic will be reduced to a single lane to ensure connectivity is maintained, with detours in place for when works occur at intersections.”

Want more free local news? Follow Sunshine Coast News on Facebook, LinkedIn and Instagram.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share