100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Tourism attraction and resort project gets green light for operational works

Do you have a news tip? Click here to send to our news team.

Proposal for 15m lakefront building opens for feedback

The public notification phase over a proposed 15m waterfront building with a trio of three-bedroom units has commenced. The proposed building would be on a More

‘Haven’t stopped laughing’: woman’s $200,000 delight

A Sunshine Coast woman is laughing all the way to the bank after winning $200,000 in a lotto game. The Peregian Beach resident was successful More

A cut above: landscape projects earn state honours

Three standout Sunshine Coast landscape designs have been celebrated with state awards. The Caloundra Community and Creative Hub, Wallumburn at Lake Cooroibah and The Green More

Dawson’s final murder appeal rejected by High Court

The case of Lynette Dawson's disappearance and murder has been closed after more than four decades as the High Court refused to entertain her More

Photo of the day: grazing happily

“Our beloved national animal happily shares the grounds at the University of the Sunshine Coast with we humans. Kangaroo spotting is always a delight More

Urgent $20m package unveiled to ‘close gaps’ in island

The state government has unveiled a bold $20 million "emergency intervention" package to tackle erosion and protect communities affected by changes to Bribie Island. The More

A proposed tourist attraction and resort complex is closer to becoming a reality, after construction plans for it were rubber stamped.

Sunshine Coast Council has approved a development permit for operational work at Lot 2 of 2562 Steve Irwin Way, paving the way for an “extraordinary development” at Glenview.

It’s a key stepping stone for the creation of 51 two-and-three-bedroom lakeside apartments, the ACTVENTURE Waterpark and 23 luxurious apartments that are set to overlook a PerfectSwell Surf Pool.

Sanad Capital’s Brad Sutherland was delighted to get a green light.

“We are elated to announce this significant milestone in our journey towards creating a world-class entertainment hub,” he said via a media release.

“The approved engineering and operational works for Lot 2 epitomise our commitment to innovation, excellence and providing a complete destination, with unparalleled experiences for our visitors.

“We are excited to introduce a unique blend of premium and exhilarating attractions, redefining the concept of lifestyle entertainment.”

The development permit for operational work covers roadworks, landscaping, stormwater and earthworks.

Unless extended, the currency period for the development approval is two years.

It is subject to conditions, which include a management plan incorporating traffic control and communication with the public.

It also requires a landscape plan that improves future sustainability, and a construction plan that minimises impacts on the surrounding environment.

Other conditions are related to erosion and sediment control, work hours, air emissions and waste disposal.

The surf pool is expected to create a variety of waves that replicate a point break, beach break and reef break.

Sanad said the surf pool was set to “redefine entertainment standards” on the Sunshine Coast.

It’s expected to be one of the first of its kind in Australia, offering patrons the ability to book in surfing sessions tailored to their ability.

The American Wave Machine’s patented surf pool technology creates a variety of waves that replicate point break, beach break and reef break surf.

The adjacent apartments are set provide a vantage point to watch the surf pool.

Lot 2 would complement Lot 1, which also has approval for operational works and is undergoing a detailed design phase.

Lot 1 is set to include another water park, a four-star Invigorate Family Resort, micro-brewery, retail and food and beverage precinct, boat shed, sports club with tennis and basketball courts, action sports, outdoor playground, swimming pool and restaurant.

The entire project, over 25 hectare (61 acres), is expected to cost $350m.

Sanad aims to open the complex in stages during 2025/26, depending on several supplies from North America and Asia.

The project in its entirety. It should feature an array of accommodation, entertainment, activities and dining.

Like stories about Sunshine Coast people doing great things? Help us deliver more by registering for our FREE daily news feed. All it requires is your name and email at the bottom of this article.

Subscribe to SCN’s free daily news email

This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share