100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

'Where is the timeline?': works delayed on section of road amid backlog of repair jobs

Do you have a news tip? Click here to send to our news team.

Police investigate crash involving pedestrian

Police are investigating a serious crash on a major road that left a woman with life-threatening injuries. Initial investigations indicate that a 44-year-old woman was More

Sami Muirhead: sticking to the simple pleasures

Looking for the key to a happy life? According to my 11-year-old, it’s simple: “Big stick equals happy kid”. As we walked along a breathtaking More

Police investigate serious crash

The Forensic Crash Unit is investigating after a serious traffic crash left a woman critically injured. Police said initial investigations indicated a grey Suzuki Ingnis More

Hospital parking spillover sparks council review

Parking overflow from a major Sunshine Coast hospital is being reviewed, with council analysing survey results to find solutions to congestion concerns in surrounding More

Bumper sale highlights appeal of landmark towers

The multimillion-dollar sale of a penthouse has reinforced the lure of a prominent point on the Sunshine Coast. No. 15/1 Pacific Boulevard at Point Cartwright More

Eighties-inspired venue opens on beach strip

A new cafe has opened on the Coast, bringing a retro-inspired menu and specialty coffee offering to the local dining scene. Milk Bar Alex has More

A section of hinterland road remains closed almost 18 months after it was affected by a landslip.

The State Government has told Sunshine Coast News there is no timeframe to repair an estimated 200m of northbound lane on Kilcoy-Beerway Road at Cedarton.

The area was affected by a landslip, which occurred during a period of heavy rain in early 2022.

State Member for Glass House Andrew Powell expressed his dismay at the delay, while officials said they were trying to work through hundreds of rectification jobs caused by the floods.

Mr Powell said commuters deserved to know when it could be completed by.

“The road has now been closed for (more than) 530 days after a drain failed and the road slipped following heavy rain in February and March of 2022,” he said.

“There really are no excuses for the issue not being resolved.

“I get the project is complicated and that we need to get this right, but where is the timeline?

“Kilcoy-Beerwah Road is well-travelled by locals and tourists alike, and they deserve to know when this section will be restored to two fully functioning lanes.”

A section of road impacted by landslip. Picture: Google Maps

About 1875 vehicles travel the route each day.

The section of winding road, which is just south of the Maleny-Stanley River Road turn-off, was completely closed immediately after the flooding, before the southbound lane was reopened in relatively quick time.

But the northbound lane has essentially been in limbo since.

A spokesperson for the Department Transport and Main Roads said it was one of many sections of road that needed addressing around the region, and that works would proceed in earnest when possible.

“This site is one of more than 450 projects across southern Queensland being managed by the department following the 2022 floods and, due to the large number of sites, the program of rectification works is being delivered progressively,” they said.

The spokesperson said the section of road remained closed “to ensure the safety of road users, while the damage was assessed, geotechnical investigations conducted and the repair works scoped and designed”.

“Temporary traffic signals have been in place to manage traffic flow through the affected area with minimal delays to motorists,” they said.

The turnoff to Kilcoy-Beerwah Road. Picture: Google Maps

The site received a high-risk rating during post-flood assessments and the spokesperson said rectification of the site would require a thorough detailed design approach.

Assistance will be provided through the jointly funded Commonwealth-State Disaster Recovery Funding Arrangements.

“The Kilcoy-Beerwah landslip site, as with all DRFA sites, is still under consideration as part of a broader program of recovery work and we are currently in the process of finalising detailed design and undertaking procurement for construction across the program,” the spokesperson said.

“Timing for construction for Kilcoy-Beerwah Road landslip site will be confirmed once detailed design is finalised after all engineering events are fully considered.”

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

Subscribe to SCN’s free daily news email

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
[scn_go_back_button] Return Home
Share